Wastewater management in Garwollines (Q85283): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The waste water treatment plant does not meet the quality of wastewater treated in the nitrogen range.The nitrogen parameters at the averaged 2014 tests were 38.2 mg/l > 15 mg/l.extension and reconstruction of the mechanical and biological parts of the waste water treatment plant; the installation for the preparation of the digestion sludge — the autothermal hydrolysis;extension and reconstruction of the sewage treatment plant portion of the sew...)
Property / summary
 
The waste water treatment plant does not meet the quality of wastewater treated in the nitrogen range.The nitrogen parameters at the averaged 2014 tests were 38.2 mg/l > 15 mg/l.extension and reconstruction of the mechanical and biological parts of the waste water treatment plant; the installation for the preparation of the digestion sludge — the autothermal hydrolysis;extension and reconstruction of the sewage treatment plant portion of the sewage treatment plant;biogas plant;drying oven for low temperature sediment.As part of the modernisation process, the EP will also increase its capacity to 41 250 p.e., due to the current needs and the incoming load of the pollutants.In addition, the project will implement:Construction of the sewage system at ul.Anders, Słańska, cich, Maków — 3.25 km — renovation of the sewage network — 3.21 km — construction of the rainwater drainage network — 0.32 km. (English)
Property / summary: The waste water treatment plant does not meet the quality of wastewater treated in the nitrogen range.The nitrogen parameters at the averaged 2014 tests were 38.2 mg/l > 15 mg/l.extension and reconstruction of the mechanical and biological parts of the waste water treatment plant; the installation for the preparation of the digestion sludge — the autothermal hydrolysis;extension and reconstruction of the sewage treatment plant portion of the sewage treatment plant;biogas plant;drying oven for low temperature sediment.As part of the modernisation process, the EP will also increase its capacity to 41 250 p.e., due to the current needs and the incoming load of the pollutants.In addition, the project will implement:Construction of the sewage system at ul.Anders, Słańska, cich, Maków — 3.25 km — renovation of the sewage network — 3.21 km — construction of the rainwater drainage network — 0.32 km. (English) / rank
 
Normal rank

Revision as of 10:07, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Wastewater management in Garwollines
Project in Poland financed by DG Regio

    Statements

    0 references
    22,597,001.49 zloty
    0 references
    5,423,280.3576 Euro
    13 January 2020
    0 references
    50,313,109.43 zloty
    0 references
    12,075,146.2632 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2018
    0 references
    PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Oczyszczalnia ścieków nie spełnia jakości ścieków oczyszczonych w zakresie azotu. Parametry azotu w uśrednionych badaniach za rok 2014 wynosiły 38,2 mg/l > 15 mg/l. Zakres modernizacji OŚ: rozbudowa i przebudowa części mechanicznej i biologicznej oczyszczalni ścieków;instalacja do przygotowania osadów do fermentacji – autotermiczna hydroliza; rozbudowa i przebudowa części osadowej oczyszczalni ścieków; instalacja biogazu; suszarnia niskotemperaturowa osadu. W ramach modernizacji OŚ zwiększana będzie również jej przepustowość do 41 250 RLM, co wynika z aktualnych potrzeb i dopływającego ładunku zanieczyszczeń. Dodatkowo w ramach projektu będzie realizowana: - budowa sieci kanalizacyjnej w ul. Andersa, Sławińska, Cicha, Maczka - 3,25 km - renowacja sieci kanalizacyjnej - 3,21 km, - budowa sieci kanalizacji deszczowej - 0,32km. (Polish)
    0 references
    The waste water treatment plant does not meet the quality of wastewater treated in the nitrogen range.The nitrogen parameters at the averaged 2014 tests were 38.2 mg/l > 15 mg/l.extension and reconstruction of the mechanical and biological parts of the waste water treatment plant; the installation for the preparation of the digestion sludge — the autothermal hydrolysis;extension and reconstruction of the sewage treatment plant portion of the sewage treatment plant;biogas plant;drying oven for low temperature sediment.As part of the modernisation process, the EP will also increase its capacity to 41 250 p.e., due to the current needs and the incoming load of the pollutants.In addition, the project will implement:Construction of the sewage system at ul.Anders, Słańska, cich, Maków — 3.25 km — renovation of the sewage network — 3.21 km — construction of the rainwater drainage network — 0.32 km. (English)
    0 references

    Identifiers

    POIS.02.03.00-00-0072/16
    0 references