Reconstruction of the district heating network. (Q84829): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The main objective of the project is to increase the efficiency of heat transfer by reducing losses and reducing dust emissions into the atmosphere, and to ensure reliable supply of heat to the public, while respecting the relevant quality parameters.The main reason for the action to be taken with regard to the reconstruction of the district heating main is to reduce heat losses during transportation to the public.This will be achieved by:— redu...)
Property / summary
 
The main objective of the project is to increase the efficiency of heat transfer by reducing losses and reducing dust emissions into the atmosphere, and to ensure reliable supply of heat to the public, while respecting the relevant quality parameters.The main reason for the action to be taken with regard to the reconstruction of the district heating main is to reduce heat losses during transportation to the public.This will be achieved by:— reduction of district heating pipes — change in the location of district heating pipelines by transferring the overhead network to the ground (where this is possible and economically justified) — apply to the conversion of pre-insulated pipelines equipped with an alarm system.The result of conversion of the district heating main will be the operating savings resulting from a significant reduction in heat losses during distribution and the elimination of failure to do so. (English)
Property / summary: The main objective of the project is to increase the efficiency of heat transfer by reducing losses and reducing dust emissions into the atmosphere, and to ensure reliable supply of heat to the public, while respecting the relevant quality parameters.The main reason for the action to be taken with regard to the reconstruction of the district heating main is to reduce heat losses during transportation to the public.This will be achieved by:— reduction of district heating pipes — change in the location of district heating pipelines by transferring the overhead network to the ground (where this is possible and economically justified) — apply to the conversion of pre-insulated pipelines equipped with an alarm system.The result of conversion of the district heating main will be the operating savings resulting from a significant reduction in heat losses during distribution and the elimination of failure to do so. (English) / rank
 
Normal rank

Revision as of 09:54, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the district heating network.
Project in Poland financed by DG Regio

    Statements

    0 references
    2,650,101.36 zloty
    0 references
    636,024.3263999999 Euro
    13 January 2020
    0 references
    6,988,860.0 zloty
    0 references
    1,677,326.4 Euro
    13 January 2020
    0 references
    46.69 percent
    0 references
    27 April 2017
    0 references
    30 September 2020
    0 references
    MIEJSKIE PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SP. Z O.O.
    0 references
    Główny cel projektu to podniesienie sprawności przesyłu ciepła poprzez ograniczenie strat oraz zmniejszenie emisji zanieczyszczeń pyłowo-gazowych do atmosfery, a także zapewnienie niezawodnej dostawy ciepła do odbiorców, przy zachowaniu odpowiednich parametrów jakościowych. Głównym powodem dla którego należy przedsięwziąć działania związane z przebudową magistrali ciepłowniczej jest zmniejszenie strat ciepła podczas jego transportu do odbiorców. Powyższy cel będzie można osiągnąć poprzez: - zmniejszenie średnic przewodów ciepłowniczych - zmianę usytuowania rurociągów ciepłowniczych poprzez przeniesienie sieci napowietrznych do gruntu (tam gdzie jest to możliwe i ekonomicznie uzasadnione) - zastosowanie do przebudowy rurociągów preizolowanych wyposażonych w instalację alarmową. Efektem przebudowy magistrali ciepłowniczej będą oszczędności eksploatacyjne, wynikające ze znacznego obniżenia strat ciepła podczas jego dystrybucji oraz wyeliminowanie awaryjności. (Polish)
    0 references
    The main objective of the project is to increase the efficiency of heat transfer by reducing losses and reducing dust emissions into the atmosphere, and to ensure reliable supply of heat to the public, while respecting the relevant quality parameters.The main reason for the action to be taken with regard to the reconstruction of the district heating main is to reduce heat losses during transportation to the public.This will be achieved by:— reduction of district heating pipes — change in the location of district heating pipelines by transferring the overhead network to the ground (where this is possible and economically justified) — apply to the conversion of pre-insulated pipelines equipped with an alarm system.The result of conversion of the district heating main will be the operating savings resulting from a significant reduction in heat losses during distribution and the elimination of failure to do so. (English)
    0 references

    Identifiers

    POIS.01.05.00-00-0023/17
    0 references