(‎Created claim: summary (P836): As part of the project, work is planned to increase the energy efficiency of the 7 buildings located in Legnica at ul. ul.Osilici 5, ul.Monuszki 11, ul.Głogowska 69-69a, ul.Mickiewicza 22, ul.4, ul.14, ul.Głogowska 91th scope of the project includes:1.Preparatory work — Energy audit and documentation and EIA (eligible cost) 2.Thermal modernisation works (eligible cost), 3.Construction supervision (eligible costs), 4.Project promotion (ineligible...)
Property / summary
 
As part of the project, work is planned to increase the energy efficiency of the 7 buildings located in Legnica at ul. ul.Osilici 5, ul.Monuszki 11, ul.Głogowska 69-69a, ul.Mickiewicza 22, ul.4, ul.14, ul.Głogowska 91th scope of the project includes:1.Preparatory work — Energy audit and documentation and EIA (eligible cost) 2.Thermal modernisation works (eligible cost), 3.Construction supervision (eligible costs), 4.Project promotion (ineligible cost) In order to make a diagnosis of the needs and the state of the buildings, the premises of Ancona ordered an audit to determine which construction works should be undertaken in order to increase the energy efficiency of the selected sites.The audit carried out indicated that work should be carried out in order to:— insulation of a wall from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Replacement of the external walls of the unheated basement — insulation of the walls of the attaines — replacement of windows — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of the outer walls — insulation of the outer wall — insulation of the outer wall — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of (English)
Property / summary: As part of the project, work is planned to increase the energy efficiency of the 7 buildings located in Legnica at ul. ul.Osilici 5, ul.Monuszki 11, ul.Głogowska 69-69a, ul.Mickiewicza 22, ul.4, ul.14, ul.Głogowska 91th scope of the project includes:1.Preparatory work — Energy audit and documentation and EIA (eligible cost) 2.Thermal modernisation works (eligible cost), 3.Construction supervision (eligible costs), 4.Project promotion (ineligible cost) In order to make a diagnosis of the needs and the state of the buildings, the premises of Ancona ordered an audit to determine which construction works should be undertaken in order to increase the energy efficiency of the selected sites.The audit carried out indicated that work should be carried out in order to:— insulation of a wall from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Replacement of the external walls of the unheated basement — insulation of the walls of the attaines — replacement of windows — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of the outer walls — insulation of the outer wall — insulation of the outer wall — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of (English) / rank
 
Normal rank

Revision as of 09:48, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of residential buildings under the management of Boards “Anhouse”
Project in Poland financed by DG Regio

    Statements

    0 references
    1,134,983.66 zloty
    0 references
    272,396.0784 Euro
    13 January 2020
    0 references
    1,829,628.17 zloty
    0 references
    439,110.7608 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    18 December 2017
    0 references
    31 December 2021
    0 references
    WSPÓLNOTA MIESZKANIOWA UL. GŁOGOWSKA 69-69A
    0 references
    W ramach realizacji przedsięwzięcia planuje się prace związane ze zwiększeniem efektywności energetycznej 7 budynków zlokalizowanych w Legnicy przy ul. ul. Okrzei 5, ul. Moniuszki 11, ul. Głogowska 69-69a, ul. Mickiewicza 22, ul. Głowackiego 4, ul. Dmowskiego 14, ul. Głogowska 91. zakres projektu obejmuje: 1. Prace przygotowawcze – audyt energetyczny i dokumentacja budowlana oraz OOŚ (koszt kwalifikowalny) 2. Prace termomodernizacyjne (koszt kwalifikowalny), 3. Nadzór budowlany (koszty kwalifikowalne), 4. Promocja projektu (koszt niekwalifikowalny) W celu dokonania diagnozy potrzeb i stanu faktycznego budynków, Zarządca nieruchomości Andom zlecił przeprowadzenie audytu, którego zadaniem było określenie, jakie prace budowlane należy przedsięwziąć, by zwiększyć efektywność energetyczną wybranych obiektów. Przeprowadzony audyt wskazał, iż należy przeprowadzić prace polegające na: - Docieplenie ściany od podwórza - Wymiana okien klatki schodowej - Wymiana drzwi od podwórza - Wymiana okien piwnicznych - Docieplenie ścian zewnętrznych piwnicy nieogrzewanej - Docieplenie ścian poddasza - Wymiana okien poddasza - Wymiana drzwi wejsciowych - Docieplenie ścian - Docieplenie dachu skośnego - Docieplenie dachu płaskiego - Wymiana drzwi wejsciowych - Docieplenie ścian zewnętrznych - Docieplenie stropu nad ostatnią kondygacją - Docieplenie stropdachu (Polish)
    0 references
    As part of the project, work is planned to increase the energy efficiency of the 7 buildings located in Legnica at ul. ul.Osilici 5, ul.Monuszki 11, ul.Głogowska 69-69a, ul.Mickiewicza 22, ul.4, ul.14, ul.Głogowska 91th scope of the project includes:1.Preparatory work — Energy audit and documentation and EIA (eligible cost) 2.Thermal modernisation works (eligible cost), 3.Construction supervision (eligible costs), 4.Project promotion (ineligible cost) In order to make a diagnosis of the needs and the state of the buildings, the premises of Ancona ordered an audit to determine which construction works should be undertaken in order to increase the energy efficiency of the selected sites.The audit carried out indicated that work should be carried out in order to:— insulation of a wall from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Exchange of doors from the yard — Replacement of the external walls of the unheated basement — insulation of the walls of the attaines — replacement of windows — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of walls — insulation of the outer walls — insulation of the outer wall — insulation of the outer wall — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of the roof over the last floor — insulation of roof walls — insulation of (English)
    0 references

    Identifiers

    POIS.01.03.02-00-0026/17
    0 references