(‎Created claim: summary (P836): The project consists of the thermal modernisation of three public utilities belonging to the Pomorskie Medical University in Szczecin (PUM).The project will be carried out in the city of Szczecin, at three locations:1.PUM sports hall — at ul.Xavero Dounski No 6A, parcel No 2/1, terb. 1054, Śródmieście 54, 2.Building of the Medical Physics Building, Study of Languages in PUM (hereinafter: zakład) — at ul.12-13, parcel No 9/5, Deterion-2155, Pogdr...)
Property / summary
 
The project consists of the thermal modernisation of three public utilities belonging to the Pomorskie Medical University in Szczecin (PUM).The project will be carried out in the city of Szczecin, at three locations:1.PUM sports hall — at ul.Xavero Dounski No 6A, parcel No 2/1, terb. 1054, Śródmieście 54, 2.Building of the Medical Physics Building, Study of Languages in PUM (hereinafter: zakład) — at ul.12-13, parcel No 9/5, Deterion-2155, Pogdróo 155, 3.Draftsstock PUM (hereinafter:teaching staff), in a hospital complex, at Al.Powstańców Wielkopolski 72;parcel 36, room 1057, in the city of 57.SCOPE OF WORK:1.HLA of the PUM (a building at ul. ul.X.Dunikowski 6A;0.17 % used for economic activity).— insulation works (insulation of walls and floor) — window and door joinery (replacement of windows and doors) — replacement of heating and door fittings — upgrading of the heating substation — installation of photovoltaic cells with a capacity of 02 MW — modernisation of ventilation system (mechanical ventilation N-W with heat recovery) — replacement of heat pumps, circulation — replacement of light sources on energy efficient — replacement of luminaires.2.Zakład PUM (ul. ul.At the sun, 12-13, 11.95 % used for economic activity).Heating work (insulation of walls and costume) — door joinery (replacement of external doors) — replacement of heating and hot water systems — replacement of pumps — replacement of light sources with energy-saving bulbs — replacement of luminaires 3.B.DYACTIVE PUM (building at Al.Powstańców Wielkopolski;14.64 % used for economic activity):— insulation works (insulation of walls and costume) — window and door joinery (replacement of windows and doors) — modernisation of the ventilation system for heating and cooling systems — modernisation of ventilation system (exchange of ice ventilation system) — replacement of pumps — replacement of light sources for energy efficient lighting — replacement of luminaires.COSTS 1 (English)
Property / summary: The project consists of the thermal modernisation of three public utilities belonging to the Pomorskie Medical University in Szczecin (PUM).The project will be carried out in the city of Szczecin, at three locations:1.PUM sports hall — at ul.Xavero Dounski No 6A, parcel No 2/1, terb. 1054, Śródmieście 54, 2.Building of the Medical Physics Building, Study of Languages in PUM (hereinafter: zakład) — at ul.12-13, parcel No 9/5, Deterion-2155, Pogdróo 155, 3.Draftsstock PUM (hereinafter:teaching staff), in a hospital complex, at Al.Powstańców Wielkopolski 72;parcel 36, room 1057, in the city of 57.SCOPE OF WORK:1.HLA of the PUM (a building at ul. ul.X.Dunikowski 6A;0.17 % used for economic activity).— insulation works (insulation of walls and floor) — window and door joinery (replacement of windows and doors) — replacement of heating and door fittings — upgrading of the heating substation — installation of photovoltaic cells with a capacity of 02 MW — modernisation of ventilation system (mechanical ventilation N-W with heat recovery) — replacement of heat pumps, circulation — replacement of light sources on energy efficient — replacement of luminaires.2.Zakład PUM (ul. ul.At the sun, 12-13, 11.95 % used for economic activity).Heating work (insulation of walls and costume) — door joinery (replacement of external doors) — replacement of heating and hot water systems — replacement of pumps — replacement of light sources with energy-saving bulbs — replacement of luminaires 3.B.DYACTIVE PUM (building at Al.Powstańców Wielkopolski;14.64 % used for economic activity):— insulation works (insulation of walls and costume) — window and door joinery (replacement of windows and doors) — modernisation of the ventilation system for heating and cooling systems — modernisation of ventilation system (exchange of ice ventilation system) — replacement of pumps — replacement of light sources for energy efficient lighting — replacement of luminaires.COSTS 1 (English) / rank
 
Normal rank

Revision as of 09:46, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Support for energy efficiency in the premises of the Medical University of Szczecin
Project in Poland financed by DG Regio

    Statements

    0 references
    3,098,777.0 zloty
    0 references
    743,706.48 Euro
    13 January 2020
    0 references
    6,270,841.47 zloty
    0 references
    1,505,001.9527999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2016
    0 references
    30 June 2019
    0 references
    POMORSKI UNIWERSYTET MEDYCZNY W SZCZECINIE
    0 references
    PRZEDMIOTEM PROJEKTU jest termomodernizacja trzech obiektów użyteczności publicznej, należących do Pomorskiego Uniwersytetu Medycznego w Szczecinie (PUM). Projekt będzie realizowany w na terenie miasta Szczecina, w trzech lokalizacjach: 1.hala sportowa PUM - przy ul. Xawerego Dunikowskiego nr 6A, działka nr 2/1, obręb ew. 1054, Śródmieście 54, 2.budynek Zakładu Fizyki Medycznej, studium Języków Obcych PUM (dalej Zakład) – przy ul. Ku Słońcu 12-13, działka nr 9/5, obręb ew. 2155, Pogodno 155, 3.budynek dydaktyczny PUM (dalej: b. dydaktyczny), w kompleksie szpitalnym – przy Al. Powstańców Wielkopolskich 72; działka nr 36, obręb ew. 1057, Śródmieście 57. ZAKRES PRAC: 1.HALA SPORTOWA PUM (budynek przy ul. ul. X.Dunikowskiego 6A; w 0,17% wykorzystywany pod działalność gospodarczą). - roboty dociepleniowe (docieplenie ścian i stropodachu) - stolarka okienna i drzwiowa (wymiana okien i drzwi) - wymiana instalacji c.o. i c.w.u. - modernizacja węzła cieplnego - montaż ogniw fotowoltaicznych o mocy o,02 MW - modernizacja systemu wentylacji (wentylacja mechaniczna N-W z odzyskiem ciepła) - wymiana pomp obiegowych, cyrkulacji - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych. 2.ZAKŁAD PUM (budynek przy ul. ul. Ku Słońcu 12-13, w 11,95 % wykorzystywany pod działalność gospodarczą). - roboty dociepleniowe (docieplenie ścian i stropodachu) - stolarka drzwiowa (wymiana drzwi zewnętrznych) - wymiana instalacji c.o. i c.w.u. - wymiana pomp - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych 3. B.DYDAKTYCZNY PUM (budynek przy Al. Powstańców Wielkopolskich; w 14,64 % wykorzystywany pod działalność gospodarczą).: - roboty dociepleniowe (docieplenie ścian i stropodachu ) - stolarka okienna i drzwiowa (wymiana okien i drzwi) - modernizacja instalacji c.o. i c.w.u. - modernizacja systemu wentylacji (wymiana układu wentylacji sali wykładowej) - wymiana pomp - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych. KOSZTY 1 (Polish)
    0 references
    The project consists of the thermal modernisation of three public utilities belonging to the Pomorskie Medical University in Szczecin (PUM).The project will be carried out in the city of Szczecin, at three locations:1.PUM sports hall — at ul.Xavero Dounski No 6A, parcel No 2/1, terb. 1054, Śródmieście 54, 2.Building of the Medical Physics Building, Study of Languages in PUM (hereinafter: zakład) — at ul.12-13, parcel No 9/5, Deterion-2155, Pogdróo 155, 3.Draftsstock PUM (hereinafter:teaching staff), in a hospital complex, at Al.Powstańców Wielkopolski 72;parcel 36, room 1057, in the city of 57.SCOPE OF WORK:1.HLA of the PUM (a building at ul. ul.X.Dunikowski 6A;0.17 % used for economic activity).— insulation works (insulation of walls and floor) — window and door joinery (replacement of windows and doors) — replacement of heating and door fittings — upgrading of the heating substation — installation of photovoltaic cells with a capacity of 02 MW — modernisation of ventilation system (mechanical ventilation N-W with heat recovery) — replacement of heat pumps, circulation — replacement of light sources on energy efficient — replacement of luminaires.2.Zakład PUM (ul. ul.At the sun, 12-13, 11.95 % used for economic activity).Heating work (insulation of walls and costume) — door joinery (replacement of external doors) — replacement of heating and hot water systems — replacement of pumps — replacement of light sources with energy-saving bulbs — replacement of luminaires 3.B.DYACTIVE PUM (building at Al.Powstańców Wielkopolski;14.64 % used for economic activity):— insulation works (insulation of walls and costume) — window and door joinery (replacement of windows and doors) — modernisation of the ventilation system for heating and cooling systems — modernisation of ventilation system (exchange of ice ventilation system) — replacement of pumps — replacement of light sources for energy efficient lighting — replacement of luminaires.COSTS 1 (English)