Improving the energy efficiency of the Municipal Pool of Horta (Q2853707): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 79.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 596,805.02 euro)
Property / budget
596,805.02 Euro
Amount596,805.02 Euro
UnitEuro
 
Property / budget: 596,805.02 Euro / rank
Normal rank
 

Revision as of 06:28, 22 October 2021

Project Q2853707 in Portugal
Language Label Description Also known as
English
Improving the energy efficiency of the Municipal Pool of Horta
Project Q2853707 in Portugal

    Statements

    0 references
    0 references
    15 January 2019
    0 references
    30 November 2021
    0 references
    MUNICÍPIO DA HORTA
    0 references
    0 references

    38°32'12.48"N, 28°37'48.40"W
    0 references
    A presente candidatura tem como objetivo a melhoria da eficiência energética da piscina municipal da Horta.Esta melhoria de uma forma resumida será atingida através da intervenção na envolvente do edifício e nos sistemas técnicos do mesmo.A nível da envolvente prevemos uma intervenção a nível da cobertura do edifício, a nível da envolvente exterior e a nível dos vãos envidraçados.Quanto aos sistemas técnicos a intervenção passará pela subst (Portuguese)
    0 references
    The aim of this application is to improve the energy efficiency of the municipal pool of Horta.This improvement in a summary way will be achieved through the intervention in the building’s surroundings and in the technical systems of the building.At the level of the surrounding area, we foresee an intervention at the level of the building’s coverage, at the level of the exterior environment and at the level of the glazed gaps.As for technical systems, the intervention will pass through the subst. (English)
    6 July 2021
    0 references
    Horta
    0 references

    Identifiers

    ACORES-04-1203-FEDER-000003
    0 references