Loss Control in the Water Supply System of the Municipality of Vale de Cambra (Q2982932): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: budget (P474): 114,626.2 euro) |
(Changed an Item: modifying budgets in portugal one item from slovenia) |
||||||
Property / budget | |||||||
286,566.0 Euro
| |||||||
Property / budget: 286,566.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
114,626.0 Euro
| |||||||
Property / EU contribution: 114,626.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
40.0 percent
| |||||||
Property / co-financing rate: 40.0 percent / rank | |||||||
Normal rank |
Revision as of 04:30, 22 October 2021
Project Q2982932 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Loss Control in the Water Supply System of the Municipality of Vale de Cambra |
Project Q2982932 in Portugal |
Statements
114,626.0 Euro
0 references
286,566.0 Euro
0 references
40.0 percent
0 references
27 June 2019
0 references
30 December 2020
0 references
MUNICÍPIO DE VALE DE CAMBRA
0 references
Tem em vista o controlo e a redução de perdas nos sistemas de distribuição e adução de água, designadamente em equipamentos para campanhas de deteção de fugas, aquisição e instalação de equipamentos de controlo e medição e telegestão. (Portuguese)
0 references
It aims to control and reduce losses in water distribution and supply systems, including equipment for leakage detection campaigns, acquisition and installation of control and measurement and tele-management equipment. (English)
9 July 2021
0 references
Vale de Cambra
0 references
Identifiers
POSEUR-03-2012-FC-001417
0 references