RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA (Q2981676): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 405,867.79 euro)
Property / budget
405,867.79 Euro
Amount405,867.79 Euro
UnitEuro
 
Property / budget: 405,867.79 Euro / rank
Normal rank
 

Revision as of 04:25, 22 October 2021

Project Q2981676 in Portugal
Language Label Description Also known as
English
RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA
Project Q2981676 in Portugal

    Statements

    0 references
    8 May 2017
    0 references
    9 March 2020
    0 references
    MUNICÍPIO DE VILA NOVA DE GAIA
    0 references
    Q3000729 (Deleted Item)
    0 references
    0 references

    41°7'46.92"N, 8°37'12.47"W
    0 references
    A presente candidatura consiste na execução das empreitadas “Bacia de Retenção do Rio Horto”, “Bacia de Retenção do Rio Horto - Arquitetura Paisagista” e “Reforço da Capacidade de Drenagem da Linha de Água de Santa Marinha, na envolvente à Av. Ramos Pinto – Santa Marinha. (Portuguese)
    0 references
    The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English)
    9 July 2021
    0 references
    Vila Nova de Gaia, União das freguesias de Santa Marinha e São Pedro da Afurada
    0 references

    Identifiers

    POSEUR-02-1810-FC-000387
    0 references