Requalification and Modernisation of the Alexandre Herculano Secondary School facilities (Q2899347): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 5,100,000.0 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 5,100,000.0 Euro / rank | |||||||
Revision as of 21:43, 21 October 2021
Project Q2899347 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification and Modernisation of the Alexandre Herculano Secondary School facilities |
Project Q2899347 in Portugal |
Statements
9 December 2019
0 references
11 December 2021
0 references
MUNICIPIO DO PORTO
0 references
Este projeto assegura a reabilitação e modernização do edifício da Escola Secundária Alexandre Herculano.A solução proposta mantém especial atenção ao valor histórico, assumindo a eliminação das construções sem qualidade arquitetónica que foram realizadas.Nesse sentido e no respeito pelo desenho original é proposta a abertura, ao nível do piso 0, de todos os vãos de comunicação, também alterados, entre as galerias/corredores e espaços exteriores. (Portuguese)
0 references
This project ensures the rehabilitation and modernisation of the building of the Alexandre Herculano Secondary School.The proposed solution keeps special attention to the historical value, assuming the elimination of buildings without architectural quality that were carried out.In this sense and respect for the original design, it is proposed to open, at the level of floor 0, all communication spans, also altered, between the galleries/corridors and exterior spaces. (English)
8 July 2021
0 references
Porto, Bonfim
0 references
Identifiers
NORTE-08-5673-FEDER-000160
0 references