Rehabilitation of the Housing Building of the Municipality of the Siege of Porto-1ª. Phase (Q2895792): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 4,866,850.0 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
5,725,706.0 Euro
Amount5,725,706.0 Euro
UnitEuro
Property / budget: 5,725,706.0 Euro / rank
 
Normal rank
Property / EU contribution
 
4,866,850.0 Euro
Amount4,866,850.0 Euro
UnitEuro
Property / EU contribution: 4,866,850.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 20:59, 21 October 2021

Project Q2895792 in Portugal
Language Label Description Also known as
English
Rehabilitation of the Housing Building of the Municipality of the Siege of Porto-1ª. Phase
Project Q2895792 in Portugal

    Statements

    0 references
    4,866,850.0 Euro
    0 references
    5,725,706.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    31 May 2021
    0 references
    MUNICIPIO DO PORTO
    0 references
    0 references

    41°9'15.84"N, 8°34'30.11"W
    0 references
    Com o objetivo de melhorar as condições de habitabilidade e de conforto dos residentes, a operação compreende a reabilitação dos Edifícios 4, 11, 12, 14, 15, 18, 23, 25, 27, 28 e 29 do Cerco Porto, num conjunto de 286 habitações, e dos edifícios 1, 2 e 3, num conjunto de 72 habitações. A reabilitação dirige-se aos diferentes elementos de construção, nomeadamente, elementos associados ao envelope exterior e, pontualmente, a instalações interiores. (Portuguese)
    0 references
    With the aim of improving the habitability and comfort conditions of residents, the operation includes the rehabilitation of Buildings 4, 11, 12, 14, 15, 18, 23, 25, 27, 28 and 29 of the Siege of Porto, in a set of 286 dwellings, and buildings 1, 2 and 3, in a set of 72 dwellings. Rehabilitation is aimed at the different construction elements, namely elements associated with the outer envelope and, on time, indoor installations. (English)
    8 July 2021
    0 references
    Porto, Campanhã
    0 references

    Identifiers

    NORTE-05-4943-FEDER-000045
    0 references