Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems (Q2982854): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 198,374.24 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
495,936.0 Euro
Amount495,936.0 Euro
UnitEuro
Property / budget: 495,936.0 Euro / rank
 
Normal rank
Property / EU contribution
 
382,138.0 Euro
Amount382,138.0 Euro
UnitEuro
Property / EU contribution: 382,138.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
77.05 percent
Amount77.05 percent
Unitpercent
Property / co-financing rate: 77.05 percent / rank
 
Normal rank

Revision as of 19:20, 21 October 2021

Project Q2982854 in Portugal
Language Label Description Also known as
English
Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems
Project Q2982854 in Portugal

    Statements

    0 references
    382,138.0 Euro
    0 references
    495,936.0 Euro
    0 references
    77.05 percent
    0 references
    1 January 2020
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE POMBAL
    0 references
    Q2990897 (Deleted Item)
    0 references
    0 references

    39°54'58.28"N, 8°37'40.51"W
    0 references
    A candidatura consiste na criação de 70 ZMC's nos 1.390 Km de rede e instalação de 70 medidores de caudal, de 147 válvulas de seccionamento e de 5 sistemas redutores de pressão, nas infraestruturas de AA já existente instalação de equipamento informático de gestão de redes e comunicação, visando a redução de perdas reais de água, que se estimam em 10% após a conclusão da empreitada a levar a efeito no âmbito desta candidatura. (Portuguese)
    0 references
    The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application. (English)
    9 July 2021
    0 references
    Pombal
    0 references

    Identifiers

    POSEUR-03-2012-FC-001297
    0 references