Closure of Wastewater Sanitation Systems Connection to Lousã/Póvoa Waste Water Treatment Plant (Q2982839): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 222,432.3 euro)
Property / budget
222,432.3 Euro
Amount222,432.3 Euro
UnitEuro
 
Property / budget: 222,432.3 Euro / rank
Normal rank
 

Revision as of 19:20, 21 October 2021

Project Q2982839 in Portugal
Language Label Description Also known as
English
Closure of Wastewater Sanitation Systems Connection to Lousã/Póvoa Waste Water Treatment Plant
Project Q2982839 in Portugal

    Statements

    0 references
    6 January 2020
    0 references
    31 January 2021
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    40°7'42.49"N, 8°13'53.90"W
    0 references
    A operação “Fecho de Sistemas de Saneamento de Águas Residuais – Ligação à ETAR da Lousã/Póvoa”, pretende executar 1905,00 ml de coletores gravíticos, 85 ramais de ligação e instalar 1 fossa séptica comunitária, com ligação ao Subsistema de Saneamento da Lousã/Póvoa e tratamento final na ETAR da Lousã/Póvoa, com descarga do efluente na linha de água localizada na proximidade da ETAR. (Portuguese)
    0 references
    The operation Closure of Wastewater Sanitation Systems Connection to the Lousã/Póvoa Water Treatment Plant, intends to execute 1905.00 ml of gravitic collectors, 85 connecting branches and install 1 community septic tank, with connection to the Lousã/Póvoa Sanitation Subsystem and final treatment in the treatment plant of Lousã/Póvoa, with discharge of the effluent in the water line located near the ETAR. (English)
    9 July 2021
    0 references
    Lousã
    0 references

    Identifiers

    POSEUR-03-2012-FC-001276
    0 references