Works at the Water Treatment Station of S João do Peso (Q2982579): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 212,997.65 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 212,997.65 Euro / rank | |||||||
Revision as of 19:19, 21 October 2021
Project Q2982579 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Works at the Water Treatment Station of S João do Peso |
Project Q2982579 in Portugal |
Statements
1 March 2018
0 references
29 May 2020
0 references
MUNICÍPIO DE VILA DE REI
0 references
Q2991038 (Deleted Item)
0 references
Esta operação surge no sentido de dar resposta à necessidade detetada de reformulação dos equipamentos existentes, consistindo na substituição de duas unidades existentes por apenas uma ETAR, visando reduzir os custos que lhes estão associados, maximizar os recursos disponibilizados e cumprir os parâmetros de descarga, a fim de concorrer para a diminuição da poluição das massas de água. (Portuguese)
0 references
This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English)
9 July 2021
0 references
Vila de Rei, São João do Peso
0 references
Identifiers
POSEUR-03-2012-FC-000829
0 references