Extension of sanitation to Caramulo (Q2982512): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 187,669.15 euro)
Property / budget
187,669.15 Euro
Amount187,669.15 Euro
UnitEuro
 
Property / budget: 187,669.15 Euro / rank
Normal rank
 

Revision as of 19:18, 21 October 2021

Project Q2982512 in Portugal
Language Label Description Also known as
English
Extension of sanitation to Caramulo
Project Q2982512 in Portugal

    Statements

    0 references
    1 August 2018
    0 references
    31 May 2021
    0 references
    MUNICÍPIO DE TONDELA
    0 references
    0 references
    0 references

    40°34'18.88"N, 8°10'3.47"W
    0 references
    Construção de cerca de 2 km de rede de drenagem de águas residuais, com a colocação de caixas de visita e os ramais de ligação prediais com a ligação à ETAR do Caramulo para fecho deste subsistema e remodelação da rede de drenagem de águas residuais existente. (Portuguese)
    0 references
    Construction of about 2 km of sewage drainage network, with the placement of visiting boxes and the building connecting branches with the connection to the Caramulo sewage plant to close this subsystem and refurbish the existing wastewater drainage network. (English)
    9 July 2021
    0 references
    Tondela, Guardão
    0 references

    Identifiers

    POSEUR-03-2012-FC-000732
    0 references