Energy efficiency at the General Hospital of the University of Coimbra (Q2981264): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 2,211,133.86 euro)
Property / budget
2,211,133.86 Euro
Amount2,211,133.86 Euro
UnitEuro
 
Property / budget: 2,211,133.86 Euro / rank
Normal rank
 

Revision as of 19:13, 21 October 2021

Project Q2981264 in Portugal
Language Label Description Also known as
English
Energy efficiency at the General Hospital of the University of Coimbra
Project Q2981264 in Portugal

    Statements

    0 references
    1 June 2018
    0 references
    31 March 2022
    0 references
    CENTRO HOSPITALAR E UNIVERSITÁRIO DE COIMBRA, E.P.E.
    0 references
    Q2992702 (Deleted Item)
    0 references
    0 references

    40°12'25.85"N, 8°28'10.49"W
    0 references
    O Hospital Geral da Universidade de Coimbra propõe-se reconverter os seus sistemas energéticos, com a utilização de LED em toda a iluminação, aquecimento de água quente por painéis solares térmicos, troca de equipamento de produção e distribuição térmica, isolamentos na envolvente opaca, novos envidraçados e produção de eletricidade por painéis fotovoltaicos para autoconsumo. (Portuguese)
    0 references
    The General Hospital of the University of Coimbra proposes to convert its energy systems, with the use of LED in all lighting, heating of hot water by thermal solar panels, exchange of equipment for production and thermal distribution, insulations in the opaque surroundings, new glazing and production of electricity by photovoltaic panels for self-consumption. (English)
    9 July 2021
    0 references
    Coimbra, União das freguesias de São Martinho do Bispo e Ribeira de Frades
    0 references

    Identifiers

    POSEUR-01-1203-FC-000188
    0 references