EXPANSION OF THE CEIP “GABRIEL FACE” THE MARINE ROCKS OF SEA (ALMERÍA) (Q3259830): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claims)
Property / budget
199,706,169.0 Euro
Amount199,706,169.0 Euro
UnitEuro
 
Property / budget: 199,706,169.0 Euro / rank
Normal rank
 
Property / co-financing rate
80.0 percent
Amount80.0 percent
Unitpercent
 
Property / co-financing rate: 80.0 percent / rank
Normal rank
 
Property / EU contribution
159,764,935.2 Euro
Amount159,764,935.2 Euro
UnitEuro
 
Property / EU contribution: 159,764,935.2 Euro / rank
Normal rank
 

Revision as of 19:01, 21 October 2021

Project Q3259830 in Spain
Language Label Description Also known as
English
EXPANSION OF THE CEIP “GABRIEL FACE” THE MARINE ROCKS OF SEA (ALMERÍA)
Project Q3259830 in Spain

    Statements

    0 references
    16 December 2017
    0 references
    16 September 2018
    0 references
    JUNTA DE ANDALUCIA
    0 references

    36°45'46.87"N, 2°36'41.72"W
    0 references
    04079
    0 references
    Esta actuación consistirá en la siguiente ampliación del CEIP "Gabriel Caro" la zona Las Marinas de Roquetas de Mar (Almería): Se amplía una línea de infantil (3 aulas) y dos de primaria (12 aulas) con sus correspondiente incremento de aseos, 4 aulas de pequeño grupo y el aula de música que le corresponde a un C3. Además se amplía el aula gimnasio con vestuarios. Respecto a espacios exteriores se incluirán las dos pistas pues el centro no contaba con ninguna y la parte proporcional de espacios exteriores, porches, aulas exteriores, juegos... por la ampliación realizada. (Spanish)
    0 references
    This action will consist of the following extension of the CEIP “Gabriel Caro” the area Las Marinas de Roquetas de Mar (Almería): It expands a children’s line (3 classrooms) and two primary (12 classrooms) with its corresponding increase of toilets, 4 small group classrooms and the music classroom that corresponds to a C3. In addition, the gym room is expanded with changing rooms. With regard to outdoor spaces, the two tracks will be included because the centre did not have any and the proportional part of outdoor spaces, porches, outdoor classrooms, games... due to the expansion carried out. (English)
    14 October 2021
    0 references
    Roquetas de Mar
    0 references

    Identifiers

    A1051051C00029
    0 references