Energy Rehabilitation of the ICC to Ramallosa DE TEO (Q3231072): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claims) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 51,919,142.0 Euro / rank | |||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 80.0 percent / rank | |||||||
Property / EU contribution | |||||||
| |||||||
Property / EU contribution: 41,535,313.6 Euro / rank | |||||||
Revision as of 15:25, 21 October 2021
Project Q3231072 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Rehabilitation of the ICC to Ramallosa DE TEO |
Project Q3231072 in Spain |
Statements
13 December 2018
0 references
30 June 2020
0 references
SECRETARIA GENERAL TECNICA DE LA CONSELLERIA DE CULTURA, EDUCACION Y ORDENACION UNIVERSITARIA
0 references
15082
0 references
Aislamiento bajo cubierta. Sistema de aislamiento SATE de 8 cm de espesor. Reforma de huecos (sustitución de la actual carpintería por una carpintería con rotura de puente térmico y sustitución de los actuales vidrios simples por vidrios dobles). Intalación de luminarias LED (Spanish)
0 references
Insulation under cover. SATE insulation system 8 cm thick. Reform of gaps (replacement of the current carpentry with a carpentry with thermal break and replacement of the current single glass with double glazing). LED luminaire installation (English)
0 references
Teo
0 references
Identifiers
071-2019000011
0 references