Arrival and Confluence Stops – Phase 2 – Bus Terminal (Q2878160): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 637,955.82 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 637,955.82 Euro / rank | |||||||
Revision as of 15:22, 21 October 2021
Project Q2878160 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Arrival and Confluence Stops – Phase 2 – Bus Terminal |
Project Q2878160 in Portugal |
Statements
30 July 2018
0 references
15 May 2022
0 references
MUNICIPIO DE TORRES VEDRAS
0 references
A operação visa a construção de uma cobertura de proteção dos cais de embarque do Terminal Rodoviário de Torres Vedras. A melhoria da interface principal de transportes públicos pretende melhorar as condições de oferta do serviço, induzindo o aumento da sua utilização, alinhando-se com as estratégias nacionais e europeias de redução dos GEE. (Portuguese)
0 references
The operation aims at the construction of a protective cover of the boarding docks of the Torres Vedras Bus Terminal. The improvement of the main public transport interface is intended to improve the conditions of service provision by increasing its use, aligning itself with national and European GHG reduction strategies. (English)
7 July 2021
0 references
Torres Vedras, União das freguesias de Torres Vedras (São Pedro, Santiago, Santa Maria do Castelo e São Miguel) e Matacães
0 references
Identifiers
CENTRO-09-1406-FEDER-000034
0 references