Restructuring Spaces of the Felismina Alcântara Secondary School (Q2871076): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 850,000.0 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 850,000.0 Euro / rank | |||||||
Revision as of 14:29, 21 October 2021
Project Q2871076 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Restructuring Spaces of the Felismina Alcântara Secondary School |
Project Q2871076 in Portugal |
Statements
5 December 2019
0 references
30 July 2021
0 references
MUNICIPIO DE MANGUALDE
0 references
São sinteticamente consideradas ações de:- Saneamento e eliminação de focos de risco sanitário - Requalificação dos sistemas de cobertura, incluindo isolamento térmico - Melhoria do desempenho energético de todos os suportes (coberturas, fachadas, caixilharia) - Substituição da rede de abastecimento de águas - Modernização das instalações sanitárias. (Portuguese)
0 references
The following are synthetically considered actions of:- Sanitation and elimination of health risk outbreaks – Requalification of coverage systems, including thermal insulation – Improvement of energy performance of all supports (coverings, fronts, boxing) – Replacement of water supply network – Modernisation of sanitary facilities. (English)
7 July 2021
0 references
Mangualde, União das freguesias de Mangualde, Mesquitela e Cunha Alta
0 references
Identifiers
CENTRO-03-5673-FEDER-000192
0 references