Recovery and environmental adaptation of the port of l’Estany in l’Ametlla de Mar (Q3215903): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claims)
Property / budget
24,573,816.0 Euro
Amount24,573,816.0 Euro
UnitEuro
 
Property / budget: 24,573,816.0 Euro / rank
Normal rank
 
Property / co-financing rate
50.0 percent
Amount50.0 percent
Unitpercent
 
Property / co-financing rate: 50.0 percent / rank
Normal rank
 
Property / EU contribution
12,286,908.0 Euro
Amount12,286,908.0 Euro
UnitEuro
 
Property / EU contribution: 12,286,908.0 Euro / rank
Normal rank
 

Revision as of 09:31, 21 October 2021

Project Q3215903 in Spain
Language Label Description Also known as
English
Recovery and environmental adaptation of the port of l’Estany in l’Ametlla de Mar
Project Q3215903 in Spain

    Statements

    0 references
    23 January 2017
    0 references
    23 April 2017
    0 references
    GENERALITAT DE CATALUNYA - DEPARTAMENTO DE TERRITORIO Y SOSTENIBILIDAD
    0 references
    0 references

    40°53'2.04"N, 0°48'8.86"E
    0 references
    43013
    0 references
    El proyecto prevé la mejora ambiental del entorno y la lámina de agua del puerto natural de l'Estany al término municipal de l'Ametlla de Mar._x000D_ La actuación consiste en la mejora ecológica y paisajística en el entorno de l'Estany Gros, que comprenden la demolición de construcciones, amarras y accesos, la retirada de material ganado al estanque y otros restos de construcción, la recuperación de la zona húmeda, con el objetivo de introducir especies como el fartet o el samaruc, la limpieza del fondo de l'Estany Gros, de pequeñas embarcaciones y de los lastras, la colocación de boyas de fondeo ecológico, la eliminación de especies introducidas invasoras, ejecución de plantaciones y mantenimiento y restauración de pequeña edificación de piedra junto a l'Estany Gros._x000D_ También está previsto integrar y mejorar de la actual carretera de acceso a la playa, mediante la integración y mejora de la actual carretera de acceso, la construcción de un nuevo vado, la recolocación de rompeolas, ejecución de plantación en rompeolas, la colocación de sistemas para impedir el acceso de embarcaciones en l'Estany Gros y la construcción de un paso seco sobre la zona no inundada de l'Estany Gros y adaptación del GR 92._x000D_ Cuando a la mejora de la playa de l'Estany se procederá a la limpieza de la arena de la playa, descompactación y criba, nivelación y redistribución de la arena y grabas, colocación de cordón de disuasión del paso para evitar el aparcamiento a la playa y ejecución de plantación y mantenimiento. (Spanish)
    0 references
    The project foresees the environmental improvement of the surroundings and the sheet of water of the natural port of l'Estany to the municipal term of l'Ametlla de Mar._x000D_ The action consists in the ecological and landscape improvement in the surroundings of l'Estany Gros, which include the demolition of buildings, moorings and accesses, the withdrawal of livestock material to the pond and other construction remains, the recovery of the wet zone, with the objective of introducing species such as the fartet or the samaruc, the cleaning of the bottom of the Estany Gros, of small boats and the ballast, the placement of ecological mooring buoys, the elimination of invasive introduced species, the carrying out of plantations and maintenance and restoration of a small stone building next to the Estany Gros._x000D_ It is also planned to integrate and improve the current access road to the beach, through the integration and improvement of the current access road, the construction of a new ford, the relocation of breakwaters, implementation of planting in breakwaters, the placement of systems to prevent the access of boats in l'Estany Gros and the construction of a dry passage over the unflooded area of ¿¿l'Estany Gros and adaptation of the GR 92._x000D_ When the improvement of the beach of l'Estany will proceed to the cleaning of the sand of the beach, decompaction and screening, leveling and redistribution of the sand and grabs, placement of dissuasion cord pass to avoid parking to the beach and execution of plantation and maintenance. (English)
    0 references
    Ametlla de Mar, L'
    0 references

    Identifiers

    PO01-005162
    0 references