Extension of Bimenes collector (Q3213845): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item)
Property / budget
 
2,847,701.69 Euro
Amount2,847,701.69 Euro
UnitEuro
Property / budget: 2,847,701.69 Euro / rank
 
Normal rank
Property / co-financing rate
 
80.0 percent
Amount80.0 percent
Unitpercent
Property / co-financing rate: 80.0 percent / rank
 
Normal rank
Property / EU contribution
 
2,278,161.35 Euro
Amount2,278,161.35 Euro
UnitEuro
Property / EU contribution: 2,278,161.35 Euro / rank
 
Normal rank

Revision as of 09:12, 21 October 2021

Project Q3213845 in Spain
Language Label Description Also known as
English
Extension of Bimenes collector
Project Q3213845 in Spain

    Statements

    0 references
    2,278,161.35 Euro
    0 references
    2,847,701.69 Euro
    0 references
    80.0 percent
    0 references
    24 May 2017
    0 references
    7 February 2021
    0 references
    CONSEJERIA DE INFRAESTRUCTURAS, MEDIO AMBIENTE Y CAMBIO CLIMATICO
    0 references
    0 references
    0 references

    43°19'30.76"N, 5°34'1.49"W
    0 references
    33006
    0 references
    Las obras se desarrollarán conforme al proyecto técnico de las mismas y consistirán en la prolongación por la vega del río Pra del tramo de colector ya ejecutado en Bimenes, desde su punto final, próximo a La Puente (Nava), hasta las inmediaciones de Ceceda (Nava), donde se conectará con el interceptor del río Piloña que finaliza en la depuradora de Ricao (Parres). En su recorrido se incorporarán los ramales de saneamiento de las poblaciones de Nava próximas a la traza: Priandi, Gradátila, Piloñeta, Buyeres y La Corva. El nuevo colector tendrá 8,5 kilómetros de longitud e incluirá en puntos intermedios del trazado un aliviadero (Piloñeta) y una estación de bombeo (Fuensanta). (Spanish)
    0 references
    Prolongation of the section of collector already executed in Bimenes, from its final point, next to La Puente (Nava), until the vicinity of Ceceda ( Nava). In Ceceda it will connect with the interceptor of the Piloña river that ends in the Waste Water Sanitation Station of Ricao (Parres). Along its route the sanitation branches in small villages next to the trace will be incorporated: Priandi, Gradátila, Piloñeta, Buyeres and La Corva. The new collector will be 8.5 kilometers long and will include a spillway (Piloñeta) and a pumping station (Fuensanta) at intermediate points along the route. (English)
    0 references
    Bimenes
    0 references

    Identifiers

    JS-01/2018
    0 references