EXECUTION ENERGETIC REHABILITATION OF FACADES PARTICULAR STREET OF ASTURIAS NUMBER 8 (Q3200226): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item)
Property / budget
 
586,114.71 Euro
Amount586,114.71 Euro
UnitEuro
Property / budget: 586,114.71 Euro / rank
 
Normal rank
Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank
Property / EU contribution
 
293,057.35 Euro
Amount293,057.35 Euro
UnitEuro
Property / EU contribution: 293,057.35 Euro / rank
 
Normal rank

Revision as of 08:37, 21 October 2021

Project Q3200226 in Spain
Language Label Description Also known as
English
EXECUTION ENERGETIC REHABILITATION OF FACADES PARTICULAR STREET OF ASTURIAS NUMBER 8
Project Q3200226 in Spain

    Statements

    0 references
    0 references
    293,057.35 Euro
    0 references
    586,114.71 Euro
    0 references
    50.0 percent
    0 references
    3 February 2018
    0 references
    23 July 2020
    0 references
    COMUNIDAD DE PROPIETARIOS CALLE PARTICULAR DE ASTURIAS NUMERO 8
    0 references
    0 references

    43°14'2.90"N, 2°53'27.64"W
    0 references
    48015
    0 references
    Reformar las fachadas del edificio mediante un sistema de Rehabilitación energética. Se aisla el edificio por el exterior, de manera que todas las capas de la fachada se encuentren calientes. Con este sistema, se acaba con los problemas de condensaciones de la cámara de aire y se dota al edificio de una mayor inercia térmica. Se eliminan los puentes térmicos y al acumular los muros el calor del interior de la vivienda, en invierno se consigue un importante ahorro energético y una reducción de las emisiones contaminantes. (Spanish)
    0 references
    Refurbish the facades of the building through an energy refurbishment system. The building is isolated from the outside, so that all the layers of the façade are warm. With this system, the condensation problems of the air chamber are eliminated and the building is given greater thermal inertia. Thermal bridges are removed and the walls accumulate heat from the interior of the house, in winter significant energy savings and a reduction in polluting emissions are achieved. (English)
    14 October 2021
    0 references
    Basauri
    0 references

    Identifiers

    FN18PAR00203
    0 references