Requalification of the Historic Nucleus of the Cova da Piedade – Public Garden (Q2882287): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 271,927.85 euro)
Property / budget
271,927.85 Euro
Amount271,927.85 Euro
UnitEuro
 
Property / budget: 271,927.85 Euro / rank
Normal rank
 

Revision as of 13:14, 20 October 2021

Project Q2882287 in Portugal
Language Label Description Also known as
English
Requalification of the Historic Nucleus of the Cova da Piedade – Public Garden
Project Q2882287 in Portugal

    Statements

    0 references
    18 January 2018
    0 references
    30 September 2020
    0 references
    MUNICÍPIO DE ALMADA
    0 references
    0 references

    38°40'43.72"N, 9°9'37.66"W
    0 references
    A requalificação do Jardim Público da Cova da Piedade assentará na manutenção da sua estrutura de caminhos e do material vegetal existente. Serão demolidos dois elementos dissonantes (o snack-bar e os sanitários). Serão remodelados os pavimentos e os passeios na envolvente do Jardim, melhorando a acessibilidade através de alterações à circulação rodoviária. Será também remodelado o parque infantil e a iluminação. (Portuguese)
    0 references
    The requalification of the Public Garden of the Cova da Piedade will be based on the maintenance of its structure of paths and existing plant material. Two dissonant elements (the snack bar and toilets) will be demolished. The floors and walks in the surroundings of the Garden will be refurbished, improving accessibility through changes to road traffic. The children’s playground and lighting will also be refurbished. (English)
    7 July 2021
    0 references
    Almada, União das freguesias de Almada, Cova da Piedade, Pragal e Cacilhas
    0 references

    Identifiers

    LISBOA-08-2316-FEDER-000059
    0 references