Replacement of asbestos coverings – Trafaria Basic School No. 3 (Q2882082): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 73,716.5 euro)
Property / budget
73,716.5 Euro
Amount73,716.5 Euro
UnitEuro
 
Property / budget: 73,716.5 Euro / rank
Normal rank
 

Revision as of 13:12, 20 October 2021

Project Q2882082 in Portugal
Language Label Description Also known as
English
Replacement of asbestos coverings – Trafaria Basic School No. 3
Project Q2882082 in Portugal

    Statements

    0 references
    1 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE ALMADA
    0 references
    0 references

    38°39'13.25"N, 9°13'1.13"W
    0 references
    A presente candidatura é referente à Escola Básica nº3 Trafaria que é um estabelecimento de ensino com 1º ciclo e jardim-de-infância É frequentado no presente ano letivo de 2020/2021 por 5 turmas 1º ciclo e 4 de educação pré-escolar num total de 196 alunos. A área abrangida pela operação nesta escola é de 1.031 m2 de cobertura de fibrocimento, o que significa 2,1% da área das 15 escolas a intervencionar. (Portuguese)
    0 references
    This application refers to Basic School No. 3 Trafaria which is an educational establishment with 1st cycle and kindergarten It is attended in this academic year 2020/2021 for 5 maltas 1st cycle and 4 of pre-school education for a total of 196 students. The area covered by the operation in this school is 1,031 m² of fibrocement coverage, which means 2.1 % of the area of the 15 schools to intervene. (English)
    7 July 2021
    0 references
    Almada, União das freguesias de Caparica e Trafaria
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000212
    0 references