Recovery and Consolidation of the Wall of the Abaluartada – Castro Marim Urban Mesh (Q2859799): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 95,877.11 euro)
Property / budget
95,877.11 Euro
Amount95,877.11 Euro
UnitEuro
 
Property / budget: 95,877.11 Euro / rank
Normal rank
 

Revision as of 11:08, 20 October 2021

Project Q2859799 in Portugal
Language Label Description Also known as
English
Recovery and Consolidation of the Wall of the Abaluartada – Castro Marim Urban Mesh
Project Q2859799 in Portugal

    Statements

    0 references
    0 references
    18 June 2018
    0 references
    30 June 2020
    0 references
    MUNICÍPIO DE CASTRO MARIM
    0 references
    0 references

    37°13'31.98"N, 7°28'28.99"W
    0 references
    A operação permite valorizar, consolidar e reabilitar o troço da muralha da cerca abaluartada, a qual faz parte do conjunto arquitetónico do Forte de S. Sebastião, classificado como monumento nacional, e que historicamente ligava o Forte ao Castelo de Castro Marim. Antes da intervenção, a muralha apresenta vários sinais de degradação e instabilidade a nível de estrutura. (Portuguese)
    0 references
    The operation allows to value, consolidate and rehabilitate the section of the wall of the abaluartada fence, which is part of the architectural ensemble of Fort S. Sebastião, classified as a national monument, and that historically connected the Fort to Castro Marim Castle. Before the intervention, the wall presents several signs of degradation and instability at the level of structure. (English)
    6 July 2021
    0 references
    Castro Marim, Castro Marim
    0 references

    Identifiers

    ALG-04-2316-FEDER-000046
    0 references