Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 196,854.22 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 196,854.22 Euro / rank | |||||||
Revision as of 10:56, 20 October 2021
Project Q2982019 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant |
Project Q2982019 in Portugal |
Statements
30 June 2016
0 references
21 April 2017
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
0 references
It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
9 July 2021
0 references
Alpiarça, Alpiarça
0 references
Identifiers
POSEUR-03-2012-FC-000040
0 references