CLEAN POINT OF THE CAROLINA (JAÉN) (Q3259978): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Clean points are suitable places for the reception and collection of household waste provided by private individuals and which must not be deposited in the usual containers located on the public road. This waste is called specific waste, and includes household waste, construction and demolition waste, waste electrical and electronic equipment, oils, batteries, non-hazardous biological and sanitary waste, etc. In any case, waste to be managed by...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
CLEAN POINT OF THE CAROLINA (JAÉN)

Revision as of 11:54, 14 October 2021

Project Q3259978 in Spain
Language Label Description Also known as
English
CLEAN POINT OF THE CAROLINA (JAÉN)
Project Q3259978 in Spain

    Statements

    0 references
    432,000.0 Euro
    0 references
    540,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 November 2017
    0 references
    31 December 2018
    0 references
    JUNTA DE ANDALUCIA
    0 references

    38°16'27.30"N, 3°36'54.97"W
    0 references
    23024
    0 references
    Los puntos limpios son lugares acondicionados convenientemente para la recepción y acopio de residuos domiciliarios aportados por particulares y que no deben ser depositados en los contenedores habituales situados en la vía pública. Estos residuos se denominan residuos específicos, y comprenden los enseres domésticos, residuos de construcción y demolición de obras, residuos de aparatos eléctricos y electrónicos, aceites, pilas, residuos biológicos y sanitarios no peligrosos, etc. En todo caso los residuos que deben ser gestionados por las Entidades Locales de acuerdo con la legislación vigente. La actuación está integrada, en primer lugar, por la redacción del proyecto de construcción del punto limpio en el municipio de La Carolina (Jaén). La Redacción del Proyecto constructivo se hace a partir de la elaboración de un estudio detallado de la situación y necesidades en materia de generación, recogida y tratamiento de los residuos que se pretende atender. Deberá estar dimensionado de acuerdo con la naturaleza y cantidad de residuos a eliminar en la actualidad y a la previsión de desarrollo en un horizonte futuro y deberá ajustarse y contener todos los apartados, estudios, cálculos y especificaciones técnicas y medioambientales que obliga la normativa y legislación actual para la redacción de esta clase de proyectos. En segundo lugar, la construcción del punto limpio. La construcción del punto limpio se divide en las actuaciones siguientes: - Movimiento de tierras y urbanización - Plataforma y viales - Cerramiento y elementos de protección - Obra civil y muros de contención - Nave cubierta para residuos especiales - Caseta de control de las instalaciones - Abastecimiento y saneamiento de agua - Instalación eléctrica - Sistemas de emergencia y protección contra incendios - Equipamiento y contenedores necesarios. A esto hay que añadir la Dirección de obra y Coordinador de Seguridad y Salud. Debido a las actuaciones que representa la ejecución de las obras del Punto Limpio y a la diversidad y especialización de los trabajos, se hace necesaria una dedicación completa e intensa para la Dirección de Obra que posibilite el ajuste entre la ejecución del proyecto y las fases y plazos previstos para su ejecución. Los terrenos son propiedad del Ayuntamiento de La Carolina (Jaén). (Spanish)
    0 references
    Clean points are suitable places for the reception and collection of household waste provided by private individuals and which must not be deposited in the usual containers located on the public road. This waste is called specific waste, and includes household waste, construction and demolition waste, waste electrical and electronic equipment, oils, batteries, non-hazardous biological and sanitary waste, etc. In any case, waste to be managed by local authorities in accordance with the legislation in force. The action is integrated, in the first place, by the drafting of the clean point construction project in the municipality of La Carolina (Jaén). The drafting of the Constructive Project is based on the preparation of a detailed study of the situation and needs in terms of generation, collection and treatment of the waste to be addressed. It must be sized according to the nature and quantity of waste to be disposed of at present and the forecast of development in a future horizon and must be adjusted and contain all the sections, studies, calculations and technical and environmental specifications required by the current legislation and legislation for the drafting of such projects. Secondly, the construction of the clean spot. The construction of the clean point is divided into the following actions: — Land movement and urbanisation — Platform and roads — Locking and protection elements — Civil works and containment walls — Covered ship for special waste — Facility control box — Water supply and sanitation — Electrical installation — Emergency systems and fire protection — Equipment and containers needed. To this we must add the Directorate of Works and Coordinator of Safety and Health. Due to the actions represented by the execution of the works of the Clean Point and the diversity and specialisation of the works, a full and intense dedication to the Works Directorate is necessary to enable the adjustment between the execution of the project and the phases and deadlines foreseen for its execution. The land is owned by the City of La Carolina (Jaén). (English)
    14 October 2021
    0 references
    Carolina, La
    0 references

    Identifiers

    A1611017M30021
    0 references