Upgrading of the existing track Maribor — Šentilj — State border (Q3273620): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Osrednjeslovenska / rank | |||
Normal rank |
Revision as of 08:11, 13 October 2021
Project Q3273620 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Upgrading of the existing track Maribor — Šentilj — State border |
Project Q3273620 in Slovakia |
Statements
118,823,529.41 Euro
0 references
11 July 2016
0 references
31 December 2023
0 references
DIREKCIJA RS ZA INFRASTRUKTURO
0 references
1000
0 references
Namen nadgradnje obstoječega tira Maribor-Šentilj-d.m. izhaja iz problematike obstoječega stanja obravnavanega odseka proge, in sicer: omejena zmogljivost obstoječega odseka proge, je ozko grlo z vidika kategorije proge, saj je dovoljena osna obremenitev kategorije C3 (20 ton na os), neustrezna stabilnost in nosilnost spodnjega ustroja (nasip Pesnica, predor Počehova), omejena koristna dolžina postajnih tirov, ki ne omogoča obratovanja vlakov dolžine 740 metrov . (Slovenian)
0 references
The purpose of upgrading the existing Maribor-Šentilj-d.m. track stems from the problem of the current state of the section of the line, namely: the limited capacity of an existing section of line is a bottleneck from the point of view of the category of line, since the permissible axle load of category C3 (20 tonnes per axle), the inadequate stability and load capacity of the lower structure (peel embankment, Počehova tunnel), the limited useful length of the station tracks, which does not allow the operation of trains of 740 metres. (English)
12 October 2021
0 references
Identifiers
OP20.03852
0 references