Remodeling performances in the streets of the center of Albacete (Q3202931): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The Action Plan for the Area of Action Centro de Albacete envisages six phases of action aimed at gaining space for pedestrians, widening sidewalks, eliminating rotating parking spaces on the public road and improving accessibility for people with reduced mobility. Of the six phases envisaged in the Action Plan, this operation is intended to implement Phases I and III., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Remodeling performances in the streets of the center of Albacete

Revision as of 00:53, 13 October 2021

Project Q3202931 in Spain
Language Label Description Also known as
English
Remodeling performances in the streets of the center of Albacete
Project Q3202931 in Spain

    Statements

    0 references
    13,969,235.2 Euro
    0 references
    17,461,544.0 Euro
    0 references
    80.0 percent
    0 references
    15 April 2018
    0 references
    15 December 2018
    0 references
    AYUNTAMIENTO DE ALBACETE
    0 references

    38°59'42.32"N, 1°51'21.31"W
    0 references
    02003
    0 references
    En el Plan de Acción correspondiente al Área de actuación Centro de Albacete se contemplan seis fases de actuación enfocadas a ganar espacio para el peatón, con ensanchamiento de aceras, eliminación de plazas de estacionamiento de rotación en la vía pública y mejora de la accesibilidad para personas con movilidad reducida. De las seis fases contempladas en el Plan de acción, esta operación tiene prevista la ejecución de las Fases I y III. (Spanish)
    0 references
    The Action Plan for the Area of Action Centro de Albacete envisages six phases of action aimed at gaining space for pedestrians, widening sidewalks, eliminating rotating parking spaces on the public road and improving accessibility for people with reduced mobility. Of the six phases envisaged in the Action Plan, this operation is intended to implement Phases I and III. (English)
    13 October 2021
    0 references
    Albacete
    0 references

    Identifiers

    FDU01CM0201
    0 references