Q3188477 (Q3188477): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The interventions included in this operation are in line with rehabilitation and renovation actions carried out in previous years on the odd margin of Marqués de Valterra Street and, in particular, with the humanisation work carried out in part of the area under review. In the case of this operation, the section covered by the project will extend to the roadway and the sidewalk of the par margin, in addition to the existing urban space adjacent...)
Property / summary
 
The interventions included in this operation are in line with rehabilitation and renovation actions carried out in previous years on the odd margin of Marqués de Valterra Street and, in particular, with the humanisation work carried out in part of the area under review. In the case of this operation, the section covered by the project will extend to the roadway and the sidewalk of the par margin, in addition to the existing urban space adjacent to Marqués de Valterra Street, located in front of the Oceanographic Institute street, which is currently undeveloped and in poor condition and which presents problems of accumulation of garbage. To connect the Oceanographic Institute street with Torrecedeira Street (which runs parallel to Marqués de Valterra on the east side), the construction of an elevator and a connecting walkway has been planned. (English)
Property / summary: The interventions included in this operation are in line with rehabilitation and renovation actions carried out in previous years on the odd margin of Marqués de Valterra Street and, in particular, with the humanisation work carried out in part of the area under review. In the case of this operation, the section covered by the project will extend to the roadway and the sidewalk of the par margin, in addition to the existing urban space adjacent to Marqués de Valterra Street, located in front of the Oceanographic Institute street, which is currently undeveloped and in poor condition and which presents problems of accumulation of garbage. To connect the Oceanographic Institute street with Torrecedeira Street (which runs parallel to Marqués de Valterra on the east side), the construction of an elevator and a connecting walkway has been planned. (English) / rank
 
Normal rank
Property / summary: The interventions included in this operation are in line with rehabilitation and renovation actions carried out in previous years on the odd margin of Marqués de Valterra Street and, in particular, with the humanisation work carried out in part of the area under review. In the case of this operation, the section covered by the project will extend to the roadway and the sidewalk of the par margin, in addition to the existing urban space adjacent to Marqués de Valterra Street, located in front of the Oceanographic Institute street, which is currently undeveloped and in poor condition and which presents problems of accumulation of garbage. To connect the Oceanographic Institute street with Torrecedeira Street (which runs parallel to Marqués de Valterra on the east side), the construction of an elevator and a connecting walkway has been planned. (English) / qualifier
 
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:06, 12 October 2021

Project Q3188477 in Spain
Language Label Description Also known as
English
No label defined
Project Q3188477 in Spain

    Statements

    0 references
    1,663,200.0 Euro
    0 references
    2,079,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 August 2017
    0 references
    31 December 2019
    0 references
    AYUNTAMIENTO DE VIGO
    0 references

    42°14'15.58"N, 8°43'28.99"W
    0 references
    36057
    0 references
    Las intervenciones incluidas en esta operación están en línea con actuaciones de rehabilitación y renovación realizadas en años anteriores en la margen impar de la calle Marqués de Valterra y, en particular, con los trabajos de humanización realizados en parte de la zona reseñada. En el caso de la presente operación, el tramo objeto del proyecto se extenderá a la calzada y a la acera de la margen par, además de al espacio urbano existente aledaño a la calle Marqués de Valterra, situado en frente a la calle Instituto Oceanográfico, que actualmente se encuentra sin urbanizar y en mal estado y que presenta problemas de acumulación de basuras. A mayores, para conectar la calle Instituto Oceanográfico con la calle Torrecedeira (que discurre paralela a Marqués de Valterra por el lado este), se ha proyectado la construcción de un ascensor y una pasarela de conexión. (Spanish)
    0 references
    The interventions included in this operation are in line with rehabilitation and renovation actions carried out in previous years on the odd margin of Marqués de Valterra Street and, in particular, with the humanisation work carried out in part of the area under review. In the case of this operation, the section covered by the project will extend to the roadway and the sidewalk of the par margin, in addition to the existing urban space adjacent to Marqués de Valterra Street, located in front of the Oceanographic Institute street, which is currently undeveloped and in poor condition and which presents problems of accumulation of garbage. To connect the Oceanographic Institute street with Torrecedeira Street (which runs parallel to Marqués de Valterra on the east side), the construction of an elevator and a connecting walkway has been planned. (English)
    12 October 2021
    0 references
    Vigo
    0 references

    Identifiers

    FDU01GA0404
    0 references