Q3179374 (Q3179374): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of very high-speed services that allow speeds of 300 Mbps symmetrical, scalable at 1 Gbps, through the technology solution chosen, a FTTH network based on the GPON standard, to 20 925 real estate units located in 281 areas belonging to the province of Cadiz, which are specified in the geographical scope of the concession decision.,...) |
||||||||||||||
Property / summary | |||||||||||||||
The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of very high-speed services that allow speeds of 300 Mbps symmetrical, scalable at 1 Gbps, through the technology solution chosen, a FTTH network based on the GPON standard, to 20 925 real estate units located in 281 areas belonging to the province of Cadiz, which are specified in the geographical scope of the concession decision. (English) | |||||||||||||||
Property / summary: The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of very high-speed services that allow speeds of 300 Mbps symmetrical, scalable at 1 Gbps, through the technology solution chosen, a FTTH network based on the GPON standard, to 20 925 real estate units located in 281 areas belonging to the province of Cadiz, which are specified in the geographical scope of the concession decision. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of very high-speed services that allow speeds of 300 Mbps symmetrical, scalable at 1 Gbps, through the technology solution chosen, a FTTH network based on the GPON standard, to 20 925 real estate units located in 281 areas belonging to the province of Cadiz, which are specified in the geographical scope of the concession decision. (English) / qualifier | |||||||||||||||
point in time: 12 October 2021
|
Revision as of 19:03, 12 October 2021
Project Q3179374 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3179374 in Spain |
Statements
6,519,999.2 Euro
0 references
8,149,999.0 Euro
0 references
80.0 percent
0 references
13 August 2020
0 references
31 December 2022
0 references
ADAMO TELECOM IBERIA SA
0 references
11999
0 references
La correcta ejecución del proyecto queda supeditada a la consecución de los objetivos, consistentes en proporcionar cobertura de servicios de muy alta velocidad que permitan velocidades de 300 Mbps simétricos, escalables a 1 Gbps, mediante la solución tecnológica elegida, una red FTTH basada en el estándar GPON, a 20.925 unidades inmobiliarias ubicadas en 281 zonas pertenecientes a la provincia de Cádiz, que se especifican en el anexo Ámbito geográfico de la resolución de concesión. (Spanish)
0 references
The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of very high-speed services that allow speeds of 300 Mbps symmetrical, scalable at 1 Gbps, through the technology solution chosen, a FTTH network based on the GPON standard, to 20 925 real estate units located in 281 areas belonging to the province of Cadiz, which are specified in the geographical scope of the concession decision. (English)
12 October 2021
0 references
Varios Municipios de Cádiz
0 references
Identifiers
TSI-061300-2020-0079
0 references