Q3134965 (Q3134965): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits,...)
Property / summary
 
The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits, South and East, allowing to connect in turn the different accesses, green areas and facilities, in addition to linking with the Itinerary of interurban connection Don Benito-Villanueva de la Serena. (English)
Property / summary: The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits, South and East, allowing to connect in turn the different accesses, green areas and facilities, in addition to linking with the Itinerary of interurban connection Don Benito-Villanueva de la Serena. (English) / rank
 
Normal rank
Property / summary: The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits, South and East, allowing to connect in turn the different accesses, green areas and facilities, in addition to linking with the Itinerary of interurban connection Don Benito-Villanueva de la Serena. (English) / qualifier
 
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:27, 12 October 2021

Project Q3134965 in Spain
Language Label Description Also known as
English
No label defined
Project Q3134965 in Spain

    Statements

    0 references
    15,933,525.6 Euro
    0 references
    19,916,907.0 Euro
    0 references
    80.0 percent
    0 references
    1 October 2018
    0 references
    31 May 2020
    0 references
    MANCOMUNIDAD DON BENITO-VILLANUEVA DE LA SERENA
    0 references
    0 references

    38°15'36.11"N, 5°51'52.09"W
    0 references
    06003
    0 references
    La Operación consiste en la Ejecución y continuidad en la ejecución del Carril Bici o senda ciclable que constituya el Cinturón de Movilidad Urbana de Villanueva de la Serena según el trazado definido en el PMUS de la Conurbación Don Benito Villanueva de la Serena. Se pretende la creación de un itinerario mixto accesible donde sea posible compatibilizar el tránsito peatonal con el ciclista, configurando el Cinturón de Movilidad Urbana en los límites, Sur y Este, permitiendo conectar a su vez los diferentes accesos, áreas verdes e instalaciones, además de enlazar con el Itinerario de conexión interurbana Don Benito-Villanueva de la Serena. (Spanish)
    0 references
    The Operation consists of the Execution and continuity in the execution of the Bicycle Rail or cycle path that constitutes the Urban Mobility Belt of Villanueva de la Serena according to the route defined in the SUMP of the Conurbación Don Benito Villanueva de la Serena. The aim is to create an accessible mixed itinerary where it is possible to reconcile the pedestrian traffic with the cyclist, configuring the Urban Mobility Belt in the limits, South and East, allowing to connect in turn the different accesses, green areas and facilities, in addition to linking with the Itinerary of interurban connection Don Benito-Villanueva de la Serena. (English)
    12 October 2021
    0 references
    Ahillones
    0 references

    Identifiers

    FCL01EX0502
    0 references