Q3134669 (Q3134669): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Operation OT4-D-A0007-OP01D, within the framework of the Action Line A0007 of the EDUSI Implementation Plan (LA 4.2.1. of the EDUSI), will support all actions to improve the accessibility conditions of a localised urban environment comprising 2 700.00 m² of public road surface. These actions will be based mainly on the redevelopment of roads through the introduction of single platforms, improvement of paving, resising, relocation and/or removal...)
Property / summary
 
Operation OT4-D-A0007-OP01D, within the framework of the Action Line A0007 of the EDUSI Implementation Plan (LA 4.2.1. of the EDUSI), will support all actions to improve the accessibility conditions of a localised urban environment comprising 2 700.00 m² of public road surface. These actions will be based mainly on the redevelopment of roads through the introduction of single platforms, improvement of paving, resising, relocation and/or removal of parking areas for the recovery of urban spaces and for pedestrian transit, eliminating architectural barriers and meeting the accessibility requirements both regional and state, so that they are suitable for the movement of elderly people with reduced mobility. _x000D_ the Operation will take place in the redevelopment of the urban environment of San Gregorio Square in Don Benito, including the intervention in the streets of San Antonio and Carchenilla, contributing to connect and give continuity to the network of accessible itineraries put in place by the City of Don Benito in the context of the intended action (San Gregorio square — Barrial Alcollarín) and connect them with those planned through Operation OT4-D-A0006-0P01D “Preferent Peatonal Itineraries Network of the Historical Town of Don Benito”, specifically the streets Velasco and Plaza de Santa María. (English)
Property / summary: Operation OT4-D-A0007-OP01D, within the framework of the Action Line A0007 of the EDUSI Implementation Plan (LA 4.2.1. of the EDUSI), will support all actions to improve the accessibility conditions of a localised urban environment comprising 2 700.00 m² of public road surface. These actions will be based mainly on the redevelopment of roads through the introduction of single platforms, improvement of paving, resising, relocation and/or removal of parking areas for the recovery of urban spaces and for pedestrian transit, eliminating architectural barriers and meeting the accessibility requirements both regional and state, so that they are suitable for the movement of elderly people with reduced mobility. _x000D_ the Operation will take place in the redevelopment of the urban environment of San Gregorio Square in Don Benito, including the intervention in the streets of San Antonio and Carchenilla, contributing to connect and give continuity to the network of accessible itineraries put in place by the City of Don Benito in the context of the intended action (San Gregorio square — Barrial Alcollarín) and connect them with those planned through Operation OT4-D-A0006-0P01D “Preferent Peatonal Itineraries Network of the Historical Town of Don Benito”, specifically the streets Velasco and Plaza de Santa María. (English) / rank
 
Normal rank
Property / summary: Operation OT4-D-A0007-OP01D, within the framework of the Action Line A0007 of the EDUSI Implementation Plan (LA 4.2.1. of the EDUSI), will support all actions to improve the accessibility conditions of a localised urban environment comprising 2 700.00 m² of public road surface. These actions will be based mainly on the redevelopment of roads through the introduction of single platforms, improvement of paving, resising, relocation and/or removal of parking areas for the recovery of urban spaces and for pedestrian transit, eliminating architectural barriers and meeting the accessibility requirements both regional and state, so that they are suitable for the movement of elderly people with reduced mobility. _x000D_ the Operation will take place in the redevelopment of the urban environment of San Gregorio Square in Don Benito, including the intervention in the streets of San Antonio and Carchenilla, contributing to connect and give continuity to the network of accessible itineraries put in place by the City of Don Benito in the context of the intended action (San Gregorio square — Barrial Alcollarín) and connect them with those planned through Operation OT4-D-A0006-0P01D “Preferent Peatonal Itineraries Network of the Historical Town of Don Benito”, specifically the streets Velasco and Plaza de Santa María. (English) / qualifier
 
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:24, 12 October 2021

Project Q3134669 in Spain
Language Label Description Also known as
English
No label defined
Project Q3134669 in Spain

    Statements

    0 references
    194,400.0 Euro
    0 references
    243,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 May 2021
    0 references
    31 May 2022
    0 references
    MANCOMUNIDAD DON BENITO-VILLANUEVA DE LA SERENA
    0 references
    0 references

    38°15'36.11"N, 5°51'52.09"W
    0 references
    06003
    0 references
    La Operación OT4-D-A0007-OP01D, en el marco de la Línea de Actuación A0007 del Plan de Implementación de la EDUSI (LA 4.2.1. de la EDUSI) dará soporte al conjunto de actuaciones que permitan la mejora de las condiciones de accesibilidad de un entorno urbano localizado que comprende 2.700,00 m2 de superficie de viario público. Dichas actuaciones se sustanciarán fundamentalmente en la reurbanización de viarios mediante la implantación de plataformas únicas, mejora de la pavimentación, redimensionado, relocalización y o supresión de áreas de aparcamiento para la recuperación de espacios urbanos y destinarlos al tránsito peatonal, eliminando barreras arquitectónicas y cumpliendo los requisitos de accesibilidad tanto autonómicos como estatales, de modo que resulten adecuados para los desplazamientos de personas de avanzada edad y con movilidad reducida. _x000D_ La Operación se sustanciará en la reurbanización del entorno Urbano de la plaza de San Gregorio en Don Benito, comprendiendo este la intervención en las calles San Antonio y Carchenilla, contribuyendo a conectar y dar continuidad a la red de itinerarios accesibles puestos en marcha por el Ayuntamiento de Don Benito en el entorno de la actuación que se pretende (plaza de San Gregorio – Barrial Alcollarín) y conectarlos con los previstos a través de la Operación OT4-D-A0006-0P01D “Red de Itinerarios Peatonales Preferentes del Casco Histórico de Don Benito”, concretamente las calles Velasco y plaza de Santa María. (Spanish)
    0 references
    Operation OT4-D-A0007-OP01D, within the framework of the Action Line A0007 of the EDUSI Implementation Plan (LA 4.2.1. of the EDUSI), will support all actions to improve the accessibility conditions of a localised urban environment comprising 2 700.00 m² of public road surface. These actions will be based mainly on the redevelopment of roads through the introduction of single platforms, improvement of paving, resising, relocation and/or removal of parking areas for the recovery of urban spaces and for pedestrian transit, eliminating architectural barriers and meeting the accessibility requirements both regional and state, so that they are suitable for the movement of elderly people with reduced mobility. _x000D_ the Operation will take place in the redevelopment of the urban environment of San Gregorio Square in Don Benito, including the intervention in the streets of San Antonio and Carchenilla, contributing to connect and give continuity to the network of accessible itineraries put in place by the City of Don Benito in the context of the intended action (San Gregorio square — Barrial Alcollarín) and connect them with those planned through Operation OT4-D-A0006-0P01D “Preferent Peatonal Itineraries Network of the Historical Town of Don Benito”, specifically the streets Velasco and Plaza de Santa María. (English)
    12 October 2021
    0 references
    Ahillones
    0 references

    Identifiers

    FCL01EX0526
    0 references