Collectors of Siero and Sariego. Basin of the Dry and Black Rivers. (Separated No 1) (Q3214393): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Asturias / rank | |||
Normal rank |
Revision as of 11:53, 12 October 2021
Project Q3214393 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Collectors of Siero and Sariego. Basin of the Dry and Black Rivers. (Separated No 1) |
Project Q3214393 in Spain |
Statements
368,847,770.4 Euro
0 references
461,059,713.0 Euro
0 references
80.0 percent
0 references
1 June 2016
0 references
28 March 2020
0 references
CONSEJERIA DE INFRAESTRUCTURAS, MEDIO AMBIENTE Y CAMBIO CLIMATICO
0 references
33999
0 references
Obras incluidas en el segregado n.º 1 del proyecto determinación de los colectores de saneamiento de las aglomeraciones deSiero y Sariego. Cuenca de los ríos Seco y Negro. (Spanish)
0 references
Works in the sanitation collectors of the Siero and Sariego agglomerations. Basin of the Seco and Negro rivers. (English)
0 references
Varios Municipios de Asturias
0 references
Identifiers
JS-21/2016
0 references