Q3213863 (Q3213863): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
43°24'36.86"N, 6°50'6.54"W
| |||||||||||
Property / coordinate location: 43°24'36.86"N, 6°50'6.54"W / rank | |||||||||||
Normal rank |
Revision as of 15:26, 10 October 2021
Project Q3213863 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3213863 in Spain |
Statements
329,257,008.8 Euro
0 references
411,571,261.0 Euro
0 references
80.0 percent
0 references
29 May 2020
0 references
29 September 2022
0 references
CONSEJERIA DE INFRAESTRUCTURAS, MEDIO AMBIENTE Y CAMBIO CLIMATICO
0 references
33007
0 references
El objeto del contrato es desarrollar el sistema de saneamiento y depuración de Boal, en el que se pretende la ejecución de un colector interceptor, las conexiones de los núcleos de Boal, Armal y Os Mazos, y la construcción de la estación depuradora de aguas residuales._x000D_ Dentro de los trabajos de actualización se contempla la modificación de la ubicación de la depuradora del sistema de saneamiento proyectado en Boal, debido a los inconvenientes que origina la compleja orografía de la parcela inicial. Derivado por este cambio de situación, se incluirá en el proyecto, el estudio de los factores afectados del diseño de la red de saneamiento. (Spanish)
0 references
The object of the contract is to develop the Boal sanitation and purification system, in which the execution of an interceptor collector, the connections of the Boal, Armal and Os Mazos nuclei, and the construction of the wastewater treatment plant are intended. ._x000D_ The updating work includes the modification of the location of the treatment plant of the proposed sanitation system in Boal, due to the inconveniences caused by the complex orography of the initial plot. Derived by this change in situation, the study of the factors affected in the design of the sanitation network will be included in the project. (English)
0 references
Boal
0 references
Identifiers
JS-64/2019
0 references