ADIF SUBSTATION PINTO (Q3194376): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
40°25'0.12"N, 3°42'12.89"W
| |||||||||||
Property / coordinate location: 40°25'0.12"N, 3°42'12.89"W / rank | |||||||||||
Normal rank |
Revision as of 11:43, 10 October 2021
Project Q3194376 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | ADIF SUBSTATION PINTO |
Project Q3194376 in Spain |
Statements
49,516,411.5 Euro
0 references
99,032,823.0 Euro
0 references
50.0 percent
0 references
16 January 2018
0 references
8 August 2020
0 references
ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS (ADIF)
0 references
28079
0 references
Instalación de un convertidor recuperador de energía de frenado regenerativo en la Subestación de Pinto (Spanish)
0 references
Installation of a regenerative braking energy recovery converter in the Pinto Substation (English)
0 references
Madrid
0 references
Identifiers
FN15FER00031
0 references