Implementation of ENERGY — PPE Hrotovice — PPE. 8 May 608, 675 55 (Q72838): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): Performance of construction work to reduce the energy performance of the existing PPE Hrotovice, 8 May (building No. 608/p.č. St. 80) by significantly improving its energy performance., Adding English summary) |
||
Property / summary | |||
Performance of construction work to reduce the energy performance of the existing PPE Hrotovice, 8 May (building No. 608/p.č. St. 80) by significantly improving its energy performance. (English) | |||
Property / summary: Performance of construction work to reduce the energy performance of the existing PPE Hrotovice, 8 May (building No. 608/p.č. St. 80) by significantly improving its energy performance. (English) / rank | |||
Normal rank |
Revision as of 19:58, 26 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of ENERGY — PPE Hrotovice — PPE. 8 May 608, 675 55 |
Project in Czech Republic financed by DG Regio |
Statements
866,968.0 Czech koruna
0 references
2,167,420.0 Czech koruna
0 references
40 percent
0 references
25 July 2018
0 references
31 May 2020
0 references
Krajské ředitelství policie kraje Vysočina
0 references
58601
0 references
Provedení stavebních úprav za účelem snížení energetické náročnosti stávajícího objektu OOP Hrotovice, nám 8. května (budova č.p. 608/p.č. St. 80) prostřednictvím výrazného zlepšení jeho energetických vlastností. (Czech)
0 references
Performance of construction work to reduce the energy performance of the existing PPE Hrotovice, 8 May (building No. 608/p.č. St. 80) by significantly improving its energy performance. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004274
0 references