D1 Modernisation — Branch 03, EXIT 29 Hedged — EXIT 34 Centre (Stage 2) _1 (Q72429): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The project concerns the modernisation of the D1 motorway in the section Hdowska — Centre (km 29,500-34,140) of 4.640 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this h...) |
||
Property / summary | |||
The project concerns the modernisation of the D1 motorway in the section Hdowska — Centre (km 29,500-34,140) of 4.640 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English) | |||
Property / summary: The project concerns the modernisation of the D1 motorway in the section Hdowska — Centre (km 29,500-34,140) of 4.640 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English) / rank | |||
Normal rank |
Revision as of 19:57, 26 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | D1 Modernisation — Branch 03, EXIT 29 Hedged — EXIT 34 Centre (Stage 2) _1 |
Project in Czech Republic financed by DG Regio |
Statements
494,823,866.25 Czech koruna
0 references
19,792,954.650000002 Euro
0.04 Euro
10 January 2020
0 references
588,858,715.0 Czech koruna
0 references
84.0309999063188 percent
0 references
1 January 2016
0 references
31 May 2017
0 references
31 May 2017
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je modernizace dálnice D1 v úseku Hvězdonice - Ostředek (km 29,500 - 34,140) v délce 4,640 km.. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
0 references
The project concerns the modernisation of the D1 motorway in the section Hdowska — Centre (km 29,500-34,140) of 4.640 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded communication, as well as to delay the current corrections. (English)
0 references
Identifiers
CZ.04.2.39/0.0/0.0/16_007/0000013
0 references