Q3192612 (Q3192612): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created a new Item)
 
(‎Changed label, description and/or aliases in en)
description / endescription / en
Project 0.6341412363956752 in Spain
Project Q3192612 in Spain

Revision as of 14:58, 8 October 2021

Project Q3192612 in Spain
Language Label Description Also known as
English
No label defined
Project Q3192612 in Spain

    Statements

    0 references
    9,664,276.8 Euro
    0 references
    12,080,346.0 Euro
    0 references
    80.0 percent
    0 references
    1 March 2018
    0 references
    31 December 2022
    0 references
    AYUNTAMIENTO DE ADRA
    0 references
    0 references
    04003
    0 references
    La operación consistirá en la creación de itinerarios peatonales preferentes y caminos escolares seguros, que fomenten el transporte no motorizado, favoreciendo los desplazamientos a pie, lo que contribuirá a la reducción en la emisión de CO2., con dos itinerarios que se encuentran en el núcleo urbano de Adra:_x000D_ • Itinerario C.E.I.P. Mare Nostrum, con una longitud de 4.842,31 m._x000D_ • Itinerario C.E.I.P. San Fernando, con una longitud de 4.663,00 m. (Spanish)
    0 references
    The operation will consist of the creation of preferential pedestrian itineraries and safe school roads, which encourage non-motorized transportation, favoring on foot journeys, which will contribute to the reduction in CO2 emission., With two itineraries that are located in the nucleus Urban Adra:_x000D_ • Itinerary C.E.I.P. Mare Nostrum, with a length of 4,842.31 m._x000D_ • Itinerary C.E.I.P. San Fernando, with a length of 4,663.00 m. (English)
    0 references
    Adra
    0 references

    Identifiers

    FCL01AN3408
    0 references