Reconstruction of pedestrian walkways U Čtyre pair — Česká budka and Černá hora — footpaths (Q70668): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The aim of the project is primarily the conservation of the Krkonoše National Park. The project deals with the elimination of negative effects on the adjacent road corridor of tourist walking frames — Czech budw, located in zone I. A KRNAP and Černá hora — footpath (zone III). The surface of the walkways is intensively used by visitors of the Krkonoše and damaged by erosion. The reconstruction of the pavements will channel visitors and avoid neg...)
Property / summary
 
The aim of the project is primarily the conservation of the Krkonoše National Park. The project deals with the elimination of negative effects on the adjacent road corridor of tourist walking frames — Czech budw, located in zone I. A KRNAP and Černá hora — footpath (zone III). The surface of the walkways is intensively used by visitors of the Krkonoše and damaged by erosion. The reconstruction of the pavements will channel visitors and avoid negative impacts on valuable ecosystems. (English)
Property / summary: The aim of the project is primarily the conservation of the Krkonoše National Park. The project deals with the elimination of negative effects on the adjacent road corridor of tourist walking frames — Czech budw, located in zone I. A KRNAP and Černá hora — footpath (zone III). The surface of the walkways is intensively used by visitors of the Krkonoše and damaged by erosion. The reconstruction of the pavements will channel visitors and avoid negative impacts on valuable ecosystems. (English) / rank
 
Normal rank

Revision as of 19:38, 26 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of pedestrian walkways U Čtyre pair — Česká budka and Černá hora — footpaths
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    572,358.32 Czech koruna
    0 references
    22,894.3328 Euro
    10 January 2020
    0 references
    572,358.32 Czech koruna
    0 references
    22,894.3328 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    31 July 2021
    0 references
    Správa Krkonošského národního parku
    0 references
    0 references

    50°37'22.94"N, 15°36'38.74"E
    0 references
    54301
    0 references
    Cílem projektu je především ochrana přírody Krkonošského národního parku. Projekt řeší eliminaci negativních vlivů na přilehlý terén turistických chodníků U Čtyř pánů - Česká budka, nacházejících se v I. zóně KRNAP a Černá hora - stezka k rozhledně (III. zóna). Povrch chodníků je intenzivním využíváním návštěvníky Krkonoš a vlivem eroze poškozen. Rekonstrukcí chodníků dojde k usměrnění návštěvníků a k eliminaci negativních dopadů na cenné ekosystémy. (Czech)
    0 references
    The aim of the project is primarily the conservation of the Krkonoše National Park. The project deals with the elimination of negative effects on the adjacent road corridor of tourist walking frames — Czech budw, located in zone I. A KRNAP and Černá hora — footpath (zone III). The surface of the walkways is intensively used by visitors of the Krkonoše and damaged by erosion. The reconstruction of the pavements will channel visitors and avoid negative impacts on valuable ecosystems. (English)
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/17_078/0008005
    0 references