Rehabilitation DN56, Craiova-Calafat, km 0+ 000 + km 84+ 020 (phase II) (Q3099210): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Changed an Item) |
||
Property / intervention field | |||
Property / intervention field: TEN-T reconstructed or improved road / rank | |||
Normal rank |
Revision as of 14:31, 5 October 2021
Project Q3099210 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Rehabilitation DN56, Craiova-Calafat, km 0+ 000 + km 84+ 020 (phase II) |
Project Q3099210 in Romania |
Statements
69,396,558.27 Romanian Leu
0 references
81,643,009.72 Romanian Leu
0 references
85.0 percent
0 references
31 July 2017
0 references
31 December 2023
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
Reabilitare a 80,435 km, construirea a 2 poduri noi, 5 poduri reabilitate, 67 podete si 17 intersectii. De asemenea, reabilitarea celor 12 spatii de parcare existente. Imbunatatirea conditiilor generale de circulatie, ca urmare a realizarii rutei de ocolire, conduc la obtinerea unor economii de intre 60% si 62% iar exprimate in minute, castigul de timp se situeaza intre 12,3 minute (pentru autoturisme) si 13,8 minute pentru vehicule grele. (Romanian)
0 references
Rehabilitation of 80,435 km, construction of 2 new bridges, 5 rehabilitated bridges, 67 bridges and 17 intersections. Also, rehabilitation of the 12 existing parking spaces. The improvement of the general traffic conditions, as a result of the bypass route, leads to savings of between 60 % and 62 % and expressed in minutes, the time gain is between 12.3 minutes (for cars) and 13.8 minutes for heavy vehicles. (English)
16 September 2021
0 references
Municipiul Calafat, Romania
0 references
Municipiul Craiova, Romania
0 references
Identifiers
110638
0 references