Reducing the energy intensity of the public building – House of Culture with Súp. No. 467 (Q3110726): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Changing beneficiary name in Slovakian projects)
(‎Created claim: summary (P836): Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to th...)
Property / summary
 
Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English)
Property / summary: Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English) / rank
 
Normal rank
Property / summary: Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:13, 28 September 2021

Project Q3110726 in Slovakia
Language Label Description Also known as
English
Reducing the energy intensity of the public building – House of Culture with Súp. No. 467
Project Q3110726 in Slovakia

    Statements

    0 references
    174,065.52 Euro
    0 references
    204,782.96 Euro
    0 references
    85.0 percent
    0 references
    4 January 2017
    0 references
    7 January 2020
    0 references
    Obec Lietavská Lúčka
    0 references
    0 references

    49°7'45.77"N, 18°41'23.46"E
    0 references
    Zateplenie obvodového plášťa  bude realizované kontaktným zateplovacím systémom ETICS. Zatepļovací systém bude tvoriť kombinácia vybraných materiálov z hļadiska tepelnéRiešené časti strechy z hļadiska tepelno-technického ako aj z hļadiska odolnosti voči poveternostným vplyvom na základe hodnotení Energetického Auditu neplní svoju funkciu. Klampiarske oplechovanie a atikové oplechovania budú odstránené. Navrhnuté je kompletné odstránenie všetkých vrstiev strešného plášťa aţ po nosnú konštrukciu panel PZD, na ktoré bude uloţená nová skladba vrátane spádovej vrstvy.Pôvodné otvorové konštrukcie – drevené okná a dvere boli roku 2000 nahradené novými plastovými otvorovými konštrukciami s izolačným dvojsklom. Vzhļadom na to, že od tejto čiastočnej rekonštrukcie uplynulo 17 rokov a s ohļadom na súčasný stupeň netesnosti a jestvujúcich otvorových konštrukcií, opotrebovania kovaní a tesnení rámov je ich výmena nevyhnutná. navrhuje sa výmena za plastové okná a dvere s presklením izolačným trojsklom.V projekte sú navrhnuté odstránenie všetkých výplní s výnimkou dvojice presklených stien v zádverí. Navrhnutá je výmena za plastové okná s izolačným trojsklom s rovnakým otváraním a delením. Z titulu zateplenia budovy došlo k zmene rozmeru okien na východnej strane na 1.NP.Navrhnutá skladba strechy zodpovedá poţadovaným tepelnoizolačným požiadavkám, navrhnutá krytina zaručuje dokonalú tesnosť povrchu. Vrstvy strešného plášťa budú k podkladu kotvené mechaniky prostredníctvom teleskopických kotiev. Podļa hodnotení energetického auditu je dvojíca plynových kotlov s celkovým výkonom 96 kW technický zastaraná a vykazuje vysoký stupeň amortizácie. Táto zostava kotlov bude vymenená za 2 kotle 2x 35 kW. Bude vykonané hydraulické vyregulovanie na ústrednom kúrení so znížením teplotného spádu. Detailné parametre rieši projekt vykurovania.Budova má vyriešený bezbariérový prístup. (Slovak)
    0 references
    Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English)
    28 September 2021
    0 references

    Identifiers

    310041K652
    0 references