Insulation of school buildings for primary education in the village of Svätý Peter (Q3102509): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying co-finance rate with the percentage)
(‎Created claim: summary (P836): The project entitled “Security of School Buildings for Primary Education in the Municipality of Svätý Peter” will focus on reducing the energy intensity of the buildings in the village of Svätý Peter, namely the out-of-school care building of the primary school No. 1 and the out-of-school care building of the elementary school no. 2. The aim of the project is mainly to combine the improvement of the thermal performance of building structures wit...)
Property / summary
 
The project entitled “Security of School Buildings for Primary Education in the Municipality of Svätý Peter” will focus on reducing the energy intensity of the buildings in the village of Svätý Peter, namely the out-of-school care building of the primary school No. 1 and the out-of-school care building of the elementary school no. 2. The aim of the project is mainly to combine the improvement of the thermal performance of building structures with the modernisation of heating systems, hot water systems and other energy-saving measures in the building, which are designed to reduce energy needs to low-energy buildings. The aim of the project is to provide and implement insulation of the perimeter walls of buildings, replacement of roofing materials and replacement of opening structures. Last but not least, barrier-free access to these buildings will be provided as part of energy efficiency. As a result, the project will cover two public buildings on which energy efficiency is necessary, and at the same time each of the buildings has a separate energy audit as a starting document, the project will be divided into two main activities and a supporting activity. Each building will have its main (separate) activity.The project is not focused on any of the disadvantaged groups as a priority.The local project implementation is a building plot located in the cadastral area of the village of Svätý Peter, p. No. 6/38, 6/7 (the out-of-school care building of the primary school No.1) and p. No. 6/57, 6/15 (the out-of-school care building of the primary school No.2) to the. O. St. Peter.The measures to reduce energy consumption implemented on public buildings are directly linked to the project indicators, which will be reported during the implementation and also after the completion of the project implementation (English)
Property / summary: The project entitled “Security of School Buildings for Primary Education in the Municipality of Svätý Peter” will focus on reducing the energy intensity of the buildings in the village of Svätý Peter, namely the out-of-school care building of the primary school No. 1 and the out-of-school care building of the elementary school no. 2. The aim of the project is mainly to combine the improvement of the thermal performance of building structures with the modernisation of heating systems, hot water systems and other energy-saving measures in the building, which are designed to reduce energy needs to low-energy buildings. The aim of the project is to provide and implement insulation of the perimeter walls of buildings, replacement of roofing materials and replacement of opening structures. Last but not least, barrier-free access to these buildings will be provided as part of energy efficiency. As a result, the project will cover two public buildings on which energy efficiency is necessary, and at the same time each of the buildings has a separate energy audit as a starting document, the project will be divided into two main activities and a supporting activity. Each building will have its main (separate) activity.The project is not focused on any of the disadvantaged groups as a priority.The local project implementation is a building plot located in the cadastral area of the village of Svätý Peter, p. No. 6/38, 6/7 (the out-of-school care building of the primary school No.1) and p. No. 6/57, 6/15 (the out-of-school care building of the primary school No.2) to the. O. St. Peter.The measures to reduce energy consumption implemented on public buildings are directly linked to the project indicators, which will be reported during the implementation and also after the completion of the project implementation (English) / rank
 
Normal rank
Property / summary: The project entitled “Security of School Buildings for Primary Education in the Municipality of Svätý Peter” will focus on reducing the energy intensity of the buildings in the village of Svätý Peter, namely the out-of-school care building of the primary school No. 1 and the out-of-school care building of the elementary school no. 2. The aim of the project is mainly to combine the improvement of the thermal performance of building structures with the modernisation of heating systems, hot water systems and other energy-saving measures in the building, which are designed to reduce energy needs to low-energy buildings. The aim of the project is to provide and implement insulation of the perimeter walls of buildings, replacement of roofing materials and replacement of opening structures. Last but not least, barrier-free access to these buildings will be provided as part of energy efficiency. As a result, the project will cover two public buildings on which energy efficiency is necessary, and at the same time each of the buildings has a separate energy audit as a starting document, the project will be divided into two main activities and a supporting activity. Each building will have its main (separate) activity.The project is not focused on any of the disadvantaged groups as a priority.The local project implementation is a building plot located in the cadastral area of the village of Svätý Peter, p. No. 6/38, 6/7 (the out-of-school care building of the primary school No.1) and p. No. 6/57, 6/15 (the out-of-school care building of the primary school No.2) to the. O. St. Peter.The measures to reduce energy consumption implemented on public buildings are directly linked to the project indicators, which will be reported during the implementation and also after the completion of the project implementation (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:05, 28 September 2021

Project Q3102509 in Slovakia
Language Label Description Also known as
English
Insulation of school buildings for primary education in the village of Svätý Peter
Project Q3102509 in Slovakia

    Statements

    0 references
    390,774.78 Euro
    0 references
    459,735.03 Euro
    0 references
    85.0 percent
    0 references
    1 March 2017
    0 references
    1 June 2021
    0 references
    Obec Svätý Peter
    0 references
    0 references

    47°52'23.52"N, 18°10'58.76"E
    0 references
    Projekt s názvom „Zateplenie školských budov pre primárne vzdelávanie v obci Svätý Peter“ bude prioritne zameraný na zníženie energetickej náročnosti budov v obci Svätý Peter a to konkrétne budova mimoškolskej starostlivosti základnej školy č.1 a budova mimoškolskej starostlivosti základnej školy č. 2. Cieľ projektu je kladený najmä na kombináciu zlepšovania tepelno-technických vlastností stavebných konštrukcií s modernizáciou  vykurovacích systémov, systémov prípravy teplej vody a s inými opatreniami na úsporu energie v budove, ktoré sú navrhované na zníženie potreby energie na úroveň nízkoenergetických budov. Dôraz  bude  kladený  najmä  na  to,  aby  sa  jednotlivé  navrhované  opatrenia  navzájom dopĺňali  s  cieľom, dosiahnuť  optimálne  využitie  potenciálu  úspor  energie.Cieľom projektu je zabezpečenie a zrealizovanie zateplenie obvodových stien budov, výmeny strešných krytín a výmeny otvorových konštrukcií. V neposlednom rade bude na daných budovách zabezpečený aj bezbariérový prístup ako súčasť energetickej efektívnosti.Nakoľko predmetom projektu budú dve verejné budovy, na ktorých je nevyhnutné zabezpečenie energetickej úspornosti, a zároveň každá z budov má samostatne vypracovaný energetický audit ako východiskový dokument, projekt bude rozdelený na dve hlavné aktivity a podpornú aktivitu. Každá budova bude mať svoju hlavnú (samostatnú) aktivitu.Projekt nie je prioritne zameraný na žiadnu zo znevýhodnených skupín.Miestom realizácie projektu je stavebný pozemok, ktorý sa nachádza v katastrálnom území obce Svätý Peter, p.č. 6/38, 6/7 (budova mimoškolskej starostlivosti základnej školy č.1) a p.č. 6/57, 6/15  (budova mimoškolskej starostlivosti základnej školy č.2) k. ú. Svätý Peter.Uvedené opatrenia na zníženie spotreby energie realizovaných na verejných budovách sú priamo efektívne naviazané na ukazovatele projektu, ktoré budú vykazované počas realizácie a taktiež aj po ukončení realizácie projektu (Slovak)
    0 references
    The project entitled “Security of School Buildings for Primary Education in the Municipality of Svätý Peter” will focus on reducing the energy intensity of the buildings in the village of Svätý Peter, namely the out-of-school care building of the primary school No. 1 and the out-of-school care building of the elementary school no. 2. The aim of the project is mainly to combine the improvement of the thermal performance of building structures with the modernisation of heating systems, hot water systems and other energy-saving measures in the building, which are designed to reduce energy needs to low-energy buildings. The aim of the project is to provide and implement insulation of the perimeter walls of buildings, replacement of roofing materials and replacement of opening structures. Last but not least, barrier-free access to these buildings will be provided as part of energy efficiency. As a result, the project will cover two public buildings on which energy efficiency is necessary, and at the same time each of the buildings has a separate energy audit as a starting document, the project will be divided into two main activities and a supporting activity. Each building will have its main (separate) activity.The project is not focused on any of the disadvantaged groups as a priority.The local project implementation is a building plot located in the cadastral area of the village of Svätý Peter, p. No. 6/38, 6/7 (the out-of-school care building of the primary school No.1) and p. No. 6/57, 6/15 (the out-of-school care building of the primary school No.2) to the. O. St. Peter.The measures to reduce energy consumption implemented on public buildings are directly linked to the project indicators, which will be reported during the implementation and also after the completion of the project implementation (English)
    28 September 2021
    0 references

    Identifiers

    310041H729
    0 references