M Va ecká 18, For reducing the energy intensity of the building (Q3101441): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying co-finance rate with the percentage)
(‎Created claim: summary (P836): Main objective of the project: reduction of energy consumption during the operation of the Maternity School in Važecká 18 in Prešov, which will ensure a reduction in heating costs, extension of the life of structures and efficiency of the building at the level of the ultra-low energy building (A1).The main activity of the project: Reduction of the energy intensity of the public building Važecká 18, Prešov through the reduction of energy consumpt...)
Property / summary
 
Main objective of the project: reduction of energy consumption during the operation of the Maternity School in Važecká 18 in Prešov, which will ensure a reduction in heating costs, extension of the life of structures and efficiency of the building at the level of the ultra-low energy building (A1).The main activity of the project: Reduction of the energy intensity of the public building Važecká 18, Prešov through the reduction of energy consumption by improving the thermal and technical properties of the perimeter cladding, roof cladding and opening structures, by introducing recuperation, reconstruction of the lighting system, replacement of domestic hot water pipes and replacement of central heating bodies for new ones, together with their control and installation of thermostatic valves.Place of project implementation: Važecká 18, 080 01 PrešovLength: 9 monthsMeasurable project indicators: Estimated annual greenhouse gas emission reductions (43.08 t eqiv. CO2), Floor area of the renovated building (2619.75 m²), Energy consumption in the building after realisation (151.25 MWh/year), Energy consumption in the building before implementation(347,54 MWh/year), Reduction of final energy consumption (196292 kWh/year), Reduction of energy demand (271280 kWh/year), NOx emission reduction (33,381 kg/year), PM10 (1,997 kg/year), SO2 (2,023 kg/year), reduction of annual primary energy consumption (322522 kWh/year). (English)
Property / summary: Main objective of the project: reduction of energy consumption during the operation of the Maternity School in Važecká 18 in Prešov, which will ensure a reduction in heating costs, extension of the life of structures and efficiency of the building at the level of the ultra-low energy building (A1).The main activity of the project: Reduction of the energy intensity of the public building Važecká 18, Prešov through the reduction of energy consumption by improving the thermal and technical properties of the perimeter cladding, roof cladding and opening structures, by introducing recuperation, reconstruction of the lighting system, replacement of domestic hot water pipes and replacement of central heating bodies for new ones, together with their control and installation of thermostatic valves.Place of project implementation: Važecká 18, 080 01 PrešovLength: 9 monthsMeasurable project indicators: Estimated annual greenhouse gas emission reductions (43.08 t eqiv. CO2), Floor area of the renovated building (2619.75 m²), Energy consumption in the building after realisation (151.25 MWh/year), Energy consumption in the building before implementation(347,54 MWh/year), Reduction of final energy consumption (196292 kWh/year), Reduction of energy demand (271280 kWh/year), NOx emission reduction (33,381 kg/year), PM10 (1,997 kg/year), SO2 (2,023 kg/year), reduction of annual primary energy consumption (322522 kWh/year). (English) / rank
 
Normal rank
Property / summary: Main objective of the project: reduction of energy consumption during the operation of the Maternity School in Važecká 18 in Prešov, which will ensure a reduction in heating costs, extension of the life of structures and efficiency of the building at the level of the ultra-low energy building (A1).The main activity of the project: Reduction of the energy intensity of the public building Važecká 18, Prešov through the reduction of energy consumption by improving the thermal and technical properties of the perimeter cladding, roof cladding and opening structures, by introducing recuperation, reconstruction of the lighting system, replacement of domestic hot water pipes and replacement of central heating bodies for new ones, together with their control and installation of thermostatic valves.Place of project implementation: Važecká 18, 080 01 PrešovLength: 9 monthsMeasurable project indicators: Estimated annual greenhouse gas emission reductions (43.08 t eqiv. CO2), Floor area of the renovated building (2619.75 m²), Energy consumption in the building after realisation (151.25 MWh/year), Energy consumption in the building before implementation(347,54 MWh/year), Reduction of final energy consumption (196292 kWh/year), Reduction of energy demand (271280 kWh/year), NOx emission reduction (33,381 kg/year), PM10 (1,997 kg/year), SO2 (2,023 kg/year), reduction of annual primary energy consumption (322522 kWh/year). (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:58, 28 September 2021

Project Q3101441 in Slovakia
Language Label Description Also known as
English
M Va ecká 18, For reducing the energy intensity of the building
Project Q3101441 in Slovakia

    Statements

    0 references
    544,706.47 Euro
    0 references
    640,831.14 Euro
    0 references
    85.0 percent
    0 references
    1 June 2018
    0 references
    1 January 2020
    0 references
    Mesto Prešov
    0 references
    Q3120112 (Deleted Item)
    0 references

    48°59'9.60"N, 21°15'8.14"E
    0 references
    Hlavný cieľ projektu: zníženie spotreby energie pri prevádzke Materskej školy na ulici Važecká 18 v Prešove, čím sa zabezpečí zníženie nákladov na vykurovanie, predĺženie životnosti konštrukcií a hospodárnosť budovy na úrovni ultranízkoenergetickej budovy (A1).Hlavná aktivita projektu: Zníženie energetickej náročnosti verejnej budovy MŠ Važecká 18, Prešov a to prostredníctvom zníženia spotreby energie zlepšením tepelno-technických vlastností obvodového plášťa, strešného plášťa a otvorových konštrukcií, zavedením rekuperácie, rekonštrukcia osvetľovacej sústavy, výmenou potrubia teplej úžitkovej vody a výmenou telies ústredného vykurovania za nové spolu s ich vyregulovaním a osadením termostatických ventilov.Miesto realizácie projektu: Važecká 18, 080 01 PrešovDĺžka: 9 mesiacovMerateľné ukazovatele projektu: Odhadované ročné zníženie emisií skleníkových plynov (43,08 t ekviv. CO2), Podlahová plocha obnovenej budovy (2 619,75 m2), Spotreba energie v budove po realizácii (151,25 MWh/rok), Spotreba energie v budove pred realizáciou(347,54 MWh/rok), Zníženie konečnej spotreby energie (196 292 kWh/rok), Zníženie potreby energie (271 280 kWh/rok), Zníženie produkcie emisií NOx (33,381 kg/rok), PM10 (1,997 kg/rok), SO2 (2,023 kg/rok), Zníženie ročnej spotreby primárnej energie (322 522 kWh/rok). (Slovak)
    0 references
    Main objective of the project: reduction of energy consumption during the operation of the Maternity School in Važecká 18 in Prešov, which will ensure a reduction in heating costs, extension of the life of structures and efficiency of the building at the level of the ultra-low energy building (A1).The main activity of the project: Reduction of the energy intensity of the public building Važecká 18, Prešov through the reduction of energy consumption by improving the thermal and technical properties of the perimeter cladding, roof cladding and opening structures, by introducing recuperation, reconstruction of the lighting system, replacement of domestic hot water pipes and replacement of central heating bodies for new ones, together with their control and installation of thermostatic valves.Place of project implementation: Važecká 18, 080 01 PrešovLength: 9 monthsMeasurable project indicators: Estimated annual greenhouse gas emission reductions (43.08 t eqiv. CO2), Floor area of the renovated building (2619.75 m²), Energy consumption in the building after realisation (151.25 MWh/year), Energy consumption in the building before implementation(347,54 MWh/year), Reduction of final energy consumption (196292 kWh/year), Reduction of energy demand (271280 kWh/year), NOx emission reduction (33,381 kg/year), PM10 (1,997 kg/year), SO2 (2,023 kg/year), reduction of annual primary energy consumption (322522 kWh/year). (English)
    28 September 2021
    0 references

    Identifiers

    310041H068
    0 references