Plan B – ready for the future with “Plan B” (Q3089400): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3126255 / rank
 
Normal rank

Revision as of 09:54, 28 September 2021

Project in Austria 1102
Language Label Description Also known as
English
Plan B – ready for the future with “Plan B”
Project in Austria 1102

    Statements

    0 references
    111,005.43 Euro
    0 references
    17 September 2018
    0 references
    31 October 2019
    0 references
    BBZ - Bildung und Beschäftigungszentrum
    0 references
    0 references
    0 references
    Das Projekt verfolgt die Verbesserung der Arbeitsmarktintegration sowie die Erhöhung des Qualifikationsniveaus der beruflichen Mobilität und Flexibilität und der Abdeckung des strukturbedingten Qualifikationsbedarfs der bgld. Wirtschaft. (Austrian German)
    0 references
    The project aims to improve labour market integration and increase the level of vocational mobility and flexibility and to meet the structural skills needs of the bgld. Economy. (English)
    3 September 2021
    0 references

    Identifiers

    2DAAAA_00813
    0 references