D3 Svrčinovec – Skalité (2nd phase) (Q3108819): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 0.85 percent)
(‎Changed an Item: modifying co-finance rate with the percentage)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 14:36, 27 September 2021

Project Q3108819 in Slovakia
Language Label Description Also known as
English
D3 Svrčinovec – Skalité (2nd phase)
Project Q3108819 in Slovakia

    Statements

    0 references
    112,115,000.0 Euro
    0 references
    131,900,000.0 Euro
    0 references
    85.0 percent
    0 references
    9 January 2015
    0 references
    6 January 2019
    0 references
    Národná diaľničná spoločnosť, a.s.
    0 references
    0 references
    0 references

    48°9'32.98"N, 17°3'6.62"E
    0 references
    1. Cieľom projektu je dobudovanie základného diaľničného koridoru D3, čím sa skvalitnia podmienky pre medzinárodnú a vnútroštátnu dopravu a zvýši sa plynulosť, rýchlosť a zároveň bezpečnosť cestnej premávky. Po ukončení výstavby predmetného úseku D3 v dĺžke 12,3 km sa vytvoria podmienky k podstatnému odľahčeniu dopravy na ceste I/12 (odklon dopravy mimo intravilán obcí) a I/11 (odklon tranzitej nákladnej aj osobnej  dopravy).2. Aktivity projektu sú zamerané na výstavbu diaľníc a rýchlostných ciest vrátane privádzačov (TEN-T CORE) s cieľom odstránenia kľúčových úzkych miest na cestnej infraštruktúre TEN-T prostredníctovm výstavby nových úsekov diaľníc a rýchlostných ciest. 3. Miestom realizácie projektu je Žilinský kraj, okres Čadca. Diaľnica D3 je súčasťou TEN-T CORE siete, pričom plní význámnú vnútroštátnu ako aj medzinárodnú dopravnú funkciu predovšetkým v smere sever - juh.4. Merateľnými ukazovateľmi predmetného projektu sú:Celková dĺžka novovybudovaných ciest v sieti TEN-T (CORE) - 12,282 km.Úspora času v cestnej doprave na diaľniciach a rýchlostných cestách - 15 568 570 eur.Úspora produkcie emisií NO2 (vplyvom výstavby diaľníc) - 15 ton.Úspora produkcie emisií PM10 (vplyvom výstavby diaľníc) - 0,58 tony. (Slovak)
    0 references
    1. The aim of the project is to complete the basic motorway corridor D3, thus improving conditions for international and national traffic and increasing fluidity, speed and road safety. After the completion of the construction of the 12,3 km section of D3 in question, conditions will be created to significantly relieve traffic on roads I/12 (diversion of traffic outside the intravilan municipalities) and I/11 (transit from both freight and passenger traffic).2. The activities of the project focus on the construction of motorways and expressways, including feeders (TEN-T CORE), with the aim of removing key bottlenecks on the TEN-T road infrastructure through the construction of new sections of motorways and expressways. 3. The place of implementation of the project is Žilinský kraj, okres Čadca. The D3 motorway is part of the TEN-T CORE network, performing a well-known national and international transport function, particularly in the north-south direction.4. Measurable indicators of the project in question sú:Celková length of newly built roads on the TEN-T network (CORE) – 12.282 km.Saving time in road transport on motorways and expressways – EUR 15 568 570.Saving of NO2 emissions (impact of motorway construction) – 15 tonnes.Saving emissions of PM10 (impact of motorway construction) – 0.58 tonnes. (English)
    15 September 2021
    0 references

    Identifiers

    311021G032
    0 references