(‎Created claim: summary (P836): The project is an eco-investment project, addresses the reduction of dust emissions to installations for transport and the back establishment of the steel sinter plant (No 594/3), which gives rise to a significant proportion of dust emissions due to current technology and dedusting. The reduction of dust emissions and the greening of operations will be achieved through the installation of equipment in the area of collection from the homogenisati...)
Property / summary
 
The project is an eco-investment project, addresses the reduction of dust emissions to installations for transport and the back establishment of the steel sinter plant (No 594/3), which gives rise to a significant proportion of dust emissions due to current technology and dedusting. The reduction of dust emissions and the greening of operations will be achieved through the installation of equipment in the area of collection from the homogenisation landfill site and all transfers will be closed and connected to the new filtration equipment. (English)
Property / summary: The project is an eco-investment project, addresses the reduction of dust emissions to installations for transport and the back establishment of the steel sinter plant (No 594/3), which gives rise to a significant proportion of dust emissions due to current technology and dedusting. The reduction of dust emissions and the greening of operations will be achieved through the installation of equipment in the area of collection from the homogenisation landfill site and all transfers will be closed and connected to the new filtration equipment. (English) / rank
 
Normal rank

Revision as of 11:08, 26 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Dedusting equipment for transport and back establishment for steel sinter plant production
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    162,834,060.4 Czech koruna
    0 references
    6,513,362.416 Euro
    10 January 2020
    0 references
    296,061,928.0 Czech koruna
    0 references
    11,842,477.120000001 Euro
    10 January 2020
    0 references
    55 percent
    0 references
    15 June 2018
    0 references
    30 September 2020
    0 references
    TŘINECKÉ ŽELEZÁRNY, a. s.
    0 references

    49°40'14.59"N, 18°39'18.79"E
    0 references
    73961
    0 references
    Projekt je ekol. investicí, řeší omezení výskytu prachových emisí na zařízení pro dopravu a zpětné zakládání vsázky pro výrobu ocelárenského aglomerátu (parc. č. 594/3), na kterém vzhledem k současné technologii a odprášení vzniká významná část vypouštěných emisí TZL. Snížení emisí TZL a ekologizace provozu bude dosaženo instalací zařízení, které bude opatřeno v oblasti odběru z homogenizační skládky skrápěcím zařízením a veškeré přesypy budou uzavřeny a napojeny na nová filtrační zařízení. (Czech)
    0 references
    The project is an eco-investment project, addresses the reduction of dust emissions to installations for transport and the back establishment of the steel sinter plant (No 594/3), which gives rise to a significant proportion of dust emissions due to current technology and dedusting. The reduction of dust emissions and the greening of operations will be achieved through the installation of equipment in the area of collection from the homogenisation landfill site and all transfers will be closed and connected to the new filtration equipment. (English)
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0000488
    0 references