Reducing the energy intensity of the production premises of VARIAKOV a.s. (Q3106030): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claims) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): VARIAKOV a.s. / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Cieľom realizácie predkladaného projektu je zníženie energetickej náročnosti podniku VARIAKOV a.s. prostredníctvom opatrení realizovaných na objekte výrobnej haly so zázemím lokalizovanej na p.č. 53/2 v priemyselnom areáli spoločnosti U.S. Steel Košice. Projekt pozostáva z 2 hlavných aktivít:HA 1: Zabezpečenie energetických auditov v MSPHA 2: Implementácia opatrení z energetických auditov V rámci projektu plánujeme realizovať nasledovné opatrenia: Rekonštrukcia a modernizácia stavebných objektov v oblasti priemyslu a služieb na to nadväzujúcich za účelom zníženia ich energetickej náročnosti, konkrétne:Zlepšenie tepelno-technických vlastností stavebných konštrukcií (zateplenie obvodového plášťa, zateplenie strešného plášťa, výmena otvorových konštrukcií),rekonštrukcia a modernizácia vykurovacích/klimatizačných systémov, systémov prípravy teplej vody,rekonštrukcia a modernizácia systémov osvetlenia. Počet opatrení energetickej efektívnosti realizovaných v podnikoch je 3. Realizáciou navrhovaného súboru opatrení na zlepšenie energetickej efektívnosti priemyselnej haly vyplývajúcich z auditu a projektovej dokumentácie, ktoré sú predmetom predkladaného projektu dôjde k zhodnoteniu objektu a najmä zníženiu energetickej náročnosti prevádzky výrobnej haly so zázemím. Úspora PEZ v podniku dosiahne 33,526 MWh/rok. Zníženie emisií skleníkových plynov po zrealizovaní plánovaných opatrení z EA dosiahne 2,062 t/rok. (Slovak) / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The aim of the present project is to reduce the energy intensity of the company VARIAKOV a.s. through measures implemented on the building of the production hall with a background located at 53/2 in the industrial area of U.S. Steel Košice. The project consists of 2 main activities:HA 1: Ensuring energy audits in SMEsHA 2: Implementation of measures from energy audits In the framework of the project we plan to implement the following measures: Reconstruction and modernisation of building objects in the field of industry and services connected to it in order to reduce their energy intensity, konkrétne:Zlepšenie thermal and technical properties of building structures (insulation of the external envelope, insulation of the roof covering, replacement of opening structures), reconstruction and modernisation of heating/air conditioning systems, hot water heating systems, reconstruction and modernisation of lighting systems. The number of energy efficiency measures implemented by enterprises is 3. By implementing the proposed set of measures to improve the energy efficiency of the industrial hall resulting from the audit and project documentation, which are the subject of the present project, the object will be evaluated and in particular the energy intensity of the operation of the production hall with the background will be reduced. The saving of EEZ in the company will be 33,526 MWh/year. The reduction of greenhouse gas emissions after implementation of the planned measures from the EA will be 2.062 t/year. (English) / rank | |||||||||||||||
Property / summary: The aim of the present project is to reduce the energy intensity of the company VARIAKOV a.s. through measures implemented on the building of the production hall with a background located at 53/2 in the industrial area of U.S. Steel Košice. The project consists of 2 main activities:HA 1: Ensuring energy audits in SMEsHA 2: Implementation of measures from energy audits In the framework of the project we plan to implement the following measures: Reconstruction and modernisation of building objects in the field of industry and services connected to it in order to reduce their energy intensity, konkrétne:Zlepšenie thermal and technical properties of building structures (insulation of the external envelope, insulation of the roof covering, replacement of opening structures), reconstruction and modernisation of heating/air conditioning systems, hot water heating systems, reconstruction and modernisation of lighting systems. The number of energy efficiency measures implemented by enterprises is 3. By implementing the proposed set of measures to improve the energy efficiency of the industrial hall resulting from the audit and project documentation, which are the subject of the present project, the object will be evaluated and in particular the energy intensity of the operation of the production hall with the background will be reduced. The saving of EEZ in the company will be 33,526 MWh/year. The reduction of greenhouse gas emissions after implementation of the planned measures from the EA will be 2.062 t/year. (English) / qualifier | |||||||||||||||
|
Revision as of 13:53, 27 September 2021
Project Q3106030 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the production premises of VARIAKOV a.s. |
Project Q3106030 in Slovakia |
Statements
199,999.22 Euro
0 references
235,293.2 Euro
0 references
0.85 percent
0 references
9 January 2018
0 references
12 January 2021
0 references
Identifiers
310041T208
0 references