Property / beneficiary name (string)
Obec Telgárt
 
Property / beneficiary name (string): Obec Telgárt / rank
Normal rank
 
Property / summary
Predkladaná projektová žiadosť rieši komplexne zásobovanie teplom 3 existujúce prevádzky verejných budov (ZŠ, MŠ a školskú jedáleň) v obci Telgárt a s tým súvisiacu zmenu palivovej základne - prechod od tuhého fosílneho plaiva na biomasu. Pôvodné 3 samostatné kotolne v 3 objektoch sa zlúčia do 1 centrálneho objektu SO 01 - Kotolňa so skladom štiepky (oprávnené náklady projektu), ktorý prostredníctvom vonkajších teplovodov - 3 trasy (neoprávnené náklady projektu) bude vykurovať všetky objekty. 4 pôvodné kotle na tuhé fosílné palivo budú nahradené za 2 kotle na biomasu. Pôvodný objekt školských dielní so skladom paliva nachádzajúci sa v areáli ZŠ bude čiastočne rekonštruovaný a rozšírení o sklad štiekpy. Stavba bude mať 1 užívateľa a prevádzkovateľa – obec. Doba realizácie stavby je odhadovaná na 6 mesiacov mimo vykutovacej sezóny. Stavba nevyvolá žiadne iné investície a nie je viazaná na inú stavbu.Skúšobná prevádzka bude stanovená po dohode s dodávateľom technolog. zariadení, počas ktorej sa ustáli prevádzkový režim, odstránia nedostatky a prípadne doplní vybavenosť. Po vykonaní všetkých predpísaných skúšok a revízií a po zaškolení obsluhy bude objekt kotolne daný do trvalej prevádzky.Realizáciou projektu dôjde k:- zlepšeniu materiálno-technického stavu rekonštruovanej budovy,- zlepšenie energetickej efektívnosti,- zvýšenie energetickej hospodárnosti budovy,- zníženie prevádzkových nákladov na vykurovanie. (Slovak)
 
Property / summary: Predkladaná projektová žiadosť rieši komplexne zásobovanie teplom 3 existujúce prevádzky verejných budov (ZŠ, MŠ a školskú jedáleň) v obci Telgárt a s tým súvisiacu zmenu palivovej základne - prechod od tuhého fosílneho plaiva na biomasu. Pôvodné 3 samostatné kotolne v 3 objektoch sa zlúčia do 1 centrálneho objektu SO 01 - Kotolňa so skladom štiepky (oprávnené náklady projektu), ktorý prostredníctvom vonkajších teplovodov - 3 trasy (neoprávnené náklady projektu) bude vykurovať všetky objekty. 4 pôvodné kotle na tuhé fosílné palivo budú nahradené za 2 kotle na biomasu. Pôvodný objekt školských dielní so skladom paliva nachádzajúci sa v areáli ZŠ bude čiastočne rekonštruovaný a rozšírení o sklad štiekpy. Stavba bude mať 1 užívateľa a prevádzkovateľa – obec. Doba realizácie stavby je odhadovaná na 6 mesiacov mimo vykutovacej sezóny. Stavba nevyvolá žiadne iné investície a nie je viazaná na inú stavbu.Skúšobná prevádzka bude stanovená po dohode s dodávateľom technolog. zariadení, počas ktorej sa ustáli prevádzkový režim, odstránia nedostatky a prípadne doplní vybavenosť. Po vykonaní všetkých predpísaných skúšok a revízií a po zaškolení obsluhy bude objekt kotolne daný do trvalej prevádzky.Realizáciou projektu dôjde k:- zlepšeniu materiálno-technického stavu rekonštruovanej budovy,- zlepšenie energetickej efektívnosti,- zvýšenie energetickej hospodárnosti budovy,- zníženie prevádzkových nákladov na vykurovanie. (Slovak) / rank
Normal rank
 
Property / summary
The submitted project application deals with the comprehensive heat supply of 3 existing public buildings (Elementary School, MŠ and school canteen) in the village of Telgárt and the related change of the fuel base – the transition from solid fossil flame to biomass. The original 3 separate boiler rooms in 3 buildings will be merged into 1 central building SO 01 – boiler room with storage of chips (eligible costs of the project), which through external hot water – 3 routes (irregular project costs) will heat all objects. 4 original solid fossil fuel boilers will be replaced by 2 biomass boilers. The original building of school workshops with fuel storage located in the premises of the primary school will be partially reconstructed and expanded with a warehouse of staples. The building will have 1 user and operator – the village. The construction period is estimated at 6 months outside the penal season. The construction will not trigger any other investments and is not tied to any other building.The test operation will be determined in agreement with the supplier of technolog. equipment, during which the operating mode is settled, will correct the shortcomings and possibly complete the equipment. After all the required tests and revisions have been carried out and after the operator has been trained, the boiler house will be put into permanent operation.The implementation of the project will result in:- improvement of the material and technical condition of the reconstructed building,- improvement of energy efficiency,- increase in the energy performance of the building,- reduction of operating costs for heating. (English)
 
Property / summary: The submitted project application deals with the comprehensive heat supply of 3 existing public buildings (Elementary School, MŠ and school canteen) in the village of Telgárt and the related change of the fuel base – the transition from solid fossil flame to biomass. The original 3 separate boiler rooms in 3 buildings will be merged into 1 central building SO 01 – boiler room with storage of chips (eligible costs of the project), which through external hot water – 3 routes (irregular project costs) will heat all objects. 4 original solid fossil fuel boilers will be replaced by 2 biomass boilers. The original building of school workshops with fuel storage located in the premises of the primary school will be partially reconstructed and expanded with a warehouse of staples. The building will have 1 user and operator – the village. The construction period is estimated at 6 months outside the penal season. The construction will not trigger any other investments and is not tied to any other building.The test operation will be determined in agreement with the supplier of technolog. equipment, during which the operating mode is settled, will correct the shortcomings and possibly complete the equipment. After all the required tests and revisions have been carried out and after the operator has been trained, the boiler house will be put into permanent operation.The implementation of the project will result in:- improvement of the material and technical condition of the reconstructed building,- improvement of energy efficiency,- increase in the energy performance of the building,- reduction of operating costs for heating. (English) / rank
Normal rank
 
Property / summary: The submitted project application deals with the comprehensive heat supply of 3 existing public buildings (Elementary School, MŠ and school canteen) in the village of Telgárt and the related change of the fuel base – the transition from solid fossil flame to biomass. The original 3 separate boiler rooms in 3 buildings will be merged into 1 central building SO 01 – boiler room with storage of chips (eligible costs of the project), which through external hot water – 3 routes (irregular project costs) will heat all objects. 4 original solid fossil fuel boilers will be replaced by 2 biomass boilers. The original building of school workshops with fuel storage located in the premises of the primary school will be partially reconstructed and expanded with a warehouse of staples. The building will have 1 user and operator – the village. The construction period is estimated at 6 months outside the penal season. The construction will not trigger any other investments and is not tied to any other building.The test operation will be determined in agreement with the supplier of technolog. equipment, during which the operating mode is settled, will correct the shortcomings and possibly complete the equipment. After all the required tests and revisions have been carried out and after the operator has been trained, the boiler house will be put into permanent operation.The implementation of the project will result in:- improvement of the material and technical condition of the reconstructed building,- improvement of energy efficiency,- increase in the energy performance of the building,- reduction of operating costs for heating. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 13:42, 27 September 2021

Project Q3105477 in Slovakia
Language Label Description Also known as
English
Increasing the share of renewable energy sources in Telgárt
Project Q3105477 in Slovakia

    Statements

    0 references
    288,977.95 Euro
    0 references
    339,974.06 Euro
    0 references
    85.0 percent
    0 references
    4 January 2021
    0 references
    9 January 2021
    0 references
    0 references

    48°51'6.12"N, 20°11'18.38"E
    0 references

    Identifiers

    310041X044