Water retention measures in the municipality of Kluknava (Q3104915): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Removed claims) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): Obec Kluknava / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Hlavným cieľom projektu „Vodozádržné opatrenia v obci Kluknava“ je prostredníctvom vybudovania vodozádržných opatrení v zastavanom území obce zníženie rizika povodní a negatívnych dôsledkov zmeny klímy. Umelo zadržaná voda sa následne bude využívať na zlepšenie mikroklímy obce formou závlah zelených plôch. Miestom realizácie projektu je intravilán obce Kluknava, okres Gelnica. Hlavnou cieľovou skupinou je 2 739 obyvateľov obce Kluknava. Predmetom projektu je vybudovanie jedného typu vodozádržného opatrenia, ktorým je výmena nepriepustnej plochy za priepustnú a výsadba zelene. Projekt svojimi aktivitami naplní zvolené merateľné ukazovatele: Počet realizovaných vodozádržných opatrení – 1, Plocha vytvoreného vodozádržného opatrenia – 1 684 m2. (Slovak) / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The main objective of the project “water-restraint measures in the municipality of Kluknava” is to reduce the risk of flooding and the negative effects of climate change by building water retention measures in the built-up area of the municipality. Artificially detained water will then be used to improve the microclimate of the village through irrigation of green areas. The place of implementation of the project is the intravilán of the village Kluknava, district Gelnica. The main target group is 2 739 inhabitants of Kluknava. The object of the project is the construction of one type of water retention measure, which is the replacement of the impermeable area for permeable and green planting. With its activities, the project will fulfil the selected measurable indicators: Number of water retention measures implemented – 1, Area of water retention measure – 1684 m². (English) / rank | |||||||||||||||
Property / summary: The main objective of the project “water-restraint measures in the municipality of Kluknava” is to reduce the risk of flooding and the negative effects of climate change by building water retention measures in the built-up area of the municipality. Artificially detained water will then be used to improve the microclimate of the village through irrigation of green areas. The place of implementation of the project is the intravilán of the village Kluknava, district Gelnica. The main target group is 2 739 inhabitants of Kluknava. The object of the project is the construction of one type of water retention measure, which is the replacement of the impermeable area for permeable and green planting. With its activities, the project will fulfil the selected measurable indicators: Number of water retention measures implemented – 1, Area of water retention measure – 1684 m². (English) / qualifier | |||||||||||||||
|
Revision as of 13:31, 27 September 2021
Project Q3104915 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Water retention measures in the municipality of Kluknava |
Project Q3104915 in Slovakia |
Statements
108,679.22 Euro
0 references
127,857.9 Euro
0 references
85.0 percent
0 references
11 January 2018
0 references
7 January 2021
0 references
Identifiers
310021T427
0 references