De-dusting of hot road transport routes in the agglomeration 1 (Q61411): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The purpose of the project is to address the dedusting system of agglomerate transport routes, including sinter cooling, in the sinter route. The hot journeys include all paired transport with the first degree of sorting of the agglomerate (current 3-device Hewitt-Robins), i.e. the articulated conveyor of 98 and the sinter cooler including a harness of the sinter strand on the conveyor belt., Adding English summary)
Property / summary
 
The purpose of the project is to address the dedusting system of agglomerate transport routes, including sinter cooling, in the sinter route. The hot journeys include all paired transport with the first degree of sorting of the agglomerate (current 3-device Hewitt-Robins), i.e. the articulated conveyor of 98 and the sinter cooler including a harness of the sinter strand on the conveyor belt. (English)
Property / summary: The purpose of the project is to address the dedusting system of agglomerate transport routes, including sinter cooling, in the sinter route. The hot journeys include all paired transport with the first degree of sorting of the agglomerate (current 3-device Hewitt-Robins), i.e. the articulated conveyor of 98 and the sinter cooler including a harness of the sinter strand on the conveyor belt. (English) / rank
 
Normal rank

Revision as of 10:56, 26 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
De-dusting of hot road transport routes in the agglomeration 1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    241,641,647.5 Czech koruna
    0 references
    9,665,665.9 Euro
    10 January 2020
    0 references
    439,348,450.0 Czech koruna
    0 references
    17,573,938.0 Euro
    10 January 2020
    0 references
    55 percent
    0 references
    30 June 2023
    0 references
    TŘINECKÉ ŽELEZÁRNY, a. s.
    0 references

    49°40'14.59"N, 18°39'18.79"E
    0 references
    73961
    0 references
    Účelem projektu je řešení odprášení horkých dopravních cest aglomerátu vč. chlazení aglomerátu. Horké dopravní cesty zahrnují veškerou pásovou dopravu za prvním stupněm třídění aglomerátu (stávající třídič Hewitt-Robins), tj. článkový dopravník č. 98 a chladič aglomerátu vč. výsypu aglomerátu z chladiče na dopravní pás. (Czech)
    0 references
    The purpose of the project is to address the dedusting system of agglomerate transport routes, including sinter cooling, in the sinter route. The hot journeys include all paired transport with the first degree of sorting of the agglomerate (current 3-device Hewitt-Robins), i.e. the articulated conveyor of 98 and the sinter cooler including a harness of the sinter strand on the conveyor belt. (English)
    0 references

    Identifiers

    CZ.05.2.28/0.0/0.0/19_136/0009917
    0 references